Laserfiche WebLink
<br /> Atlantic Isles Utility and Roadway Improvements <br /> Bid Estimated Estimated <br /> Item Descri tion Quantit Unit Unit Price Amount <br />I. General <br /> 1. Mobilization and Demobilization (<5%) LS $150,000.00 $150,000.00 <br /> 2. MOT. per FDOT including temporary striping <br /> and signage, barricades, barriers, arrow panels, <br /> etc. as required. LS $50.000.00 $50,000.00 <br /> Subtotal-General $200,000.00 <br />II. Civil <br />A Demolition / Site Preparation <br /> 3. Asphalt pavement demolition/hauling and disposal LS $30,000.00 $30.000.00 <br /> 4. Driveway demolition/Hauling and disposal LS $25,000.00 $25,000.00 <br /> 5. Drainage Structures to be removed or abandoned <br /> in place and filled with flowable fill LS $10,736.00 $10,736.00 <br /> 6. Relocate or adjust existing street signs LS $1,012.00 $1.012.00 <br /> 7. Remove power /Iight poles LS $0.00 $0.00 <br /> 8. Relocate existing mailboxes LS $2,000.00 $2,000.00 <br />B Earthwork <br /> 9. Green areas in R1W, including fine grade swales <br /> and sod (between back of curb and R1W) LS $30,000.00 $30.000.00 <br /> 10. Roadway earthwork LS $40,000.00 $40,000.00 <br />C Paving Works <br /> 11. Asphalt type, FC 12.5,2.0 inches 8,400 SY $12.00 $100,800.00 <br /> 12. 8" Iimerock base 10,000 SY $18.00 $180,000.00 <br /> 13. 12" Stabilize sub-base material 11,000 SY $2.00 $22,000.00 <br /> 14. Select fill 3,350 CY $10.00 $33,500.00 <br /> 15. Driveway restoration (per detail on sheet C-19) 2,150 SY $18.00 $38.700.00 <br /> 16. Type F curb and gutter 3,170 LF $20.00 $63,400.00 <br /> 17. Valley gutter 2,175 LF $17.00 $36,975.00 <br /> 18. Transition curb 500 LF $20.00 $10,000.00 <br /> 19. Concrete flume 5 EA $800.00 $4.000.00 <br /> 20. Flare End Curb 4 EA $550.00 $2,200.00 <br /> 21. Pavement seam joint at bridge location 1 LS $2.800.00 $2,800.00 <br />D Drainage Structures and Piles <br /> 22. Curb drop inlets 22 EA $2,600.00 $57,200.00 <br /> 23. Manhole Cover & Frame 2 EA $1.000.00 $2,000.00 <br /> 24. Catch basin Type E 3 EA $3,669.06 $11,007.18 <br /> 25. Catch basin Type D 8 EA $3,670.06 $29,360.48 <br /> 26. Catch basin Type C 14 EA $2,500.00 $35,000.00 <br /> 27. Control structures 1 LS $11,567.57 $11,567.57 <br /> 28. Pollution retardant baffles 26 EA $244.95 $6,368.70 <br /> 29. Furnish & Install 15" RCP drainage pipe complete <br /> (including but not limited to excavation, bedding, <br /> backfill, compaction & restoration as per plans <br /> and specifications) 770 LF $38.00 $29.260.00 <br /> <br />05/08-Addendum NO.5 <br /> <br />00300-2 <br /> <br />05-4893 <br />