My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JVA Engineering Contractor, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Responses
>
JVA Engineering Contractor, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:54 PM
Creation date
8/22/2008 2:59:08 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isle Roadway and Utility Improvements
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DOCUMENT 00403 <br /> <br />TRENCH SAFETY ACT <br /> <br />(90-96, Laws of Florida) <br /> <br />Bidder acknowledges that included in the appropriate bid items of the proposal and in the Total <br />Bid Price are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) <br />effective October 1, 1990. The bidder further identifies the costs of such compliance to be <br />summarized below: <br /> <br />Trench Safety <br />Measure <br />(Description) <br /> <br />A. lrtJ1J1 eu <br />B. <br />C. <br />D. <br /> <br />Unit of <br />Measure <br />(LFSF) <br /> <br />LF <br /> <br />Unit <br />(Quantity) <br /> <br />Unit <br />Cost <br /> <br />Extended <br />Cost <br /> <br />It/[f). - <br /> <br />10 <br /> <br />Iil[).~ <br /> <br />Total $ IO() {J.t J fi . <br /> <br />I <br /> <br />If applicable, the Contractor certifies that all trench excavation done within his control in excess <br />of five feet in depth shall be in accordance with the Florida Department of Transportation's <br />Special Provisions Article 125-1 and Subarticle 125-4.1 (TRE E VA TION SAFETY <br />SYSTEM AND SHORING, SPECIAL - TRENCH EXCAVATION) <br /> <br />Failure to complete the above may result in the bid being deda d no~ respon ive. <br /> <br />Contractor agrees that the above safety compliances and cos are i c uded n his bid package. <br /> <br /> <br />END OF DOCUMENT <br /> <br />05/08 Final Version <br /> <br />00403-1 <br /> <br />05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.