Laserfiche WebLink
<br />-' .....,:- <br /> <br />rn .."....1111I:.1111'''': <br /> <br />~';_'iiF.t..I.I.. 'l1]1II:J:'~"'tI::il:ll.::iINct 1II::iI::iI:IINetlllll/lI:I'llllll:J. <br /> <br />JUL-03-2008 THU 01:19 PM CALVIN & GIORDANO <br /> <br />FAX NO. 0 <br /> <br />p, 02/02 <br /> <br />Response to RFI No.1 <br /> <br />Atlantic Isles roadwllY and Utility Improvemepts <br />CITY OF SUNNY ISLES BEACH BID NO. 08.06-01 <br />CGA PROJECT NO. 05-4893 <br /> <br />July 3, 2008 <br /> <br />Central Florida Equipment <br /> <br />I. Bid Item No. 21 "Pavement seam joint at bridge" Please contirm that the specification for <br />this "seam joint" can be obtained at EE FDOT Index 1200 Sheets 1 thru 3. <br />Response: For concrete to asphalt joints Ilse self-leveling silicone or /tot pOllr <br />sealant per FDOT Flexible Pavement Manual (latest edition). <br /> <br />American En~ineering <br /> <br />1. My asphalt subcontractor tells me that type Fe 12.7 does not exist and perhaps it should <br />be Fe 12.5. In any casel an FC or friction course mix is not normally placed 2 inches <br />thick. Usually a 1" or 1.25" structure asphalt would be used for the first lift and a .75" or <br />1" FC (fri.ction course) would be used for the second lift. A 2" of type FC (Friction <br />course) asphalt is probably not going to give the City the structural integrity or longevity <br />that they expect. Please confirm the asphalt section required for this road work. <br />Response: 2" FDOT Superpave Type SP12.5 Asphaltic Concrete. <br /> <br />2. If possible, could we have two separate line items to replace bid item #9-0reen Areas in <br />ROW, including fine grade and sod? The green area earthwork is relatively minor and it <br />will be problematic to determine a precise CY quantity in the field. This is one item that <br />can probably best be handled as a slump sum item. Then the sod should be handled as a <br />separate line item by the SF for the actual quantity of sod installed in place. Sod in place <br />is easily measured in the field and then the City pays only for sod actually installed and <br />the contractor doesn't have to carry a large contingency for possible sod requirements. <br />Response: No <br /> <br />3. The bid documents require that the contractor pay for penriits. Does this include the City <br />of Sunny Isles Beach fees or will these fees be waived'? If they are to be included, can <br />you include a City pennit fee schedule in the next addendum? <br />Response: Need to getfee sc/,edulefrom City's wehsite or Building Department. <br /> <br />4. The RTD uIlit is said to be included in the base bid but there is not specification on what <br />model or what program to be 'used for the RTU unit. A specification is needed. <br />Response: RTU is part of the lift station package designated as a lump sum hid. <br /> <br />RFl Reponsos <br /> <br />.. ,',,",eastern Engineering Contr'IIlCt.rn. m <br /> <br /> <br />~~'7k~B93 <br />