My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cubellis, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Cubellis, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:02 PM
Creation date
8/28/2008 11:11:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12 NAME <br />Kevin N. Richards <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />113. ROLE IN THIS CONTRACT <br />Quality Control/Construction Inspector a TOTAL <br /> <br />II <br /> <br />14 YEARS EXPERIENCE <br />I b WITH C~RRENT FIRM <br /> <br />. <br /> <br />15 FIRM NAME AND LOCATION (Clly and State) <br />O'Leary Richards Design Associates. Inc. Miami. Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br />Bachelor of Construction Management <br />Florida International University, 1993 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications. OrganiZJ/lons, Tra,ning, Awards. elc.) <br />Completed training in Autocad and Microstation <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (Cily and Stale) (2) YEAR COMPLETED <br />Miami-Dade County Public School 2005 Modular Building Program PROFESSIONAL SERVICES I CONSTRUCTION (tfapp/lcableJ <br />Miami-Dade County, Florida 2005-2006 2007 <br />(3) BRIEF DESCRIPTION (Bnef scope. siza, COSI. erc) ANO SPECIFIC ROLE bLJ Check if project pertormed with Curlenl firm <br />a. <br />Responsibilities included the documentation of existing irrigation systems and coordinating with proposed systems, <br />review shop drawing submittals and perfonn site inspections to insure compliance with the construction documents for <br />(14) Miami-Dade County Public Schools. <br /> <br />. <br /> <br />(1) TITLE ANO LOCATION (Ciryand SIale) (2) YEAR COMPLETED <br />Various Parks for Miami-Dade County Parks and Recrcation PROFESSIONAL SERVICES I CONSTRUCTION (tfapplrcable) <br />Miami-Dade County, Florida 2000-2002 <br />(3) BRIEF DESCRIPTION (Brief scope. SIZe, COSI. etc) AND SPECIFIC ROLE U Check If proiect pertormed wilh current firm <br />b. Responsibilities includcd reviewing and revising bid documents, establishing construction schedules, initiate Requests <br />for Proposals, providing Bid Award to Contractor, managing construction and approving pay requisitions for <br />improvcments at Continental Park, Royal Green Park, Sandpiper Park and Highland Oaks Parle <br /> <br />(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETEO <br />Various G M P projects with Miam i-Dade County Publ ic Schoo I PROFESSIONAL SERVICES I CONSTRUCTION (If appl/cabla) <br />Ivliami-Dade County, Florida 200 I <br />(3) BRIEF DESCRIPTION (Briel scopa. size. cosl. e!c) AND SPECIFIC ROLE LJ Check if project performed with current firm <br />C. Project Manager for various GMP construction management at risk projects such as South Miami Senior High, South <br />Miami Middle School, Naranja Elementary School and Gloria Floyd Elementary School Responsibilities included <br />rcviewing pre-construction plans, construction cost estimating ($1 million to $15 million), bidding, procuring <br />sub-contractors, processing pay requisitions and closing-out projects. <br /> <br />(1) TITLE AND LOCATION (Coiy and Slate) (2) YEAR COMPLETED <br />Ocean Club Development PROFESSIONAL SERVICES I CONSTRUCTION (/fapplrcable) <br />Village of Key Biscaync, Florida 1999 <br />(3) BRIEF DESCRIPTION (Snef scope. SIZe, cost. ere.) AND SPECIFIC ROLE UCheck if proJecl pertormed w,lh currenl firm <br />d. <br />Project Manager for a development consisting of (9) high-end condominium buildings. Responsibilities includcd the <br />review and approval of change orders, procuring sub-contractors and managing construction for various buildings within <br />the development such as the Club Tower, Tennis Clubhouse, and Ocean Tower One Sales Model. <br /> <br />. <br /> <br />(1) TITLE AND LOCATION (Coiy and Stale) (2) YEAR COMPLETED <br />B iscayne Boulevard Roadway Improvements PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br />North Miami, Florida 1997 <br />(3) BRIEF DESCRIPTION (Bn'el scope. size. casl. ele) AND SPECIFIC ROlE U Check if prc)ect performed with curre,1l [11m <br />e. Project Manager for a $9 million dollar project consisting of widening Siscayne Boulevard, bridge construction and the <br />relocation of utility lines. Responsibilities included soliciting bids, transmitting RFI's, shop drawing review and <br />submittals. conducting wcekly construction mcetings and preparing pay requisitions. <br /> <br />STANDARD FORM 330 (6/20C4) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.