Laserfiche WebLink
<br />(j) <br /> <br />(k) <br /> <br />(1) <br /> <br />Section C. <br /> <br />Prior to construction, plans for any buildings that will have lattice work or decorative <br />screening must be submitted to the Building Official for apl'roval. <br /> <br />Any alteration, repair, reconstruction or improvement to a structure shall not enclose <br />the space below the lowest floor except with lattice work or decorative screening, as <br />provided for in Article 5, Section B(6)(h) and (i). <br /> <br />Prohibit the placement of manufactured homes (mobile homes), except in an existing <br />manufactured homes (mobile home) park or subdivision, except where otherwise <br />reauired by law and required by the City's Comprehensive Land Use Master Plan. A <br />replacement manufactured home may be placed on a lot in an existing manufactured <br />home park or subdivision provided the anchoring standards of Article 5, Section <br />B(6)(e), and the elevation standards of Article 5, Section B(6)(b) are met. <br /> <br />STANDARDS FOR STREAMS WITHOUT ESTABLISHED BASE FLOOD <br />ELEVATION AND/OR FLOODW A YS. <br /> <br />Located within the areas of special flood hazard established in Article 3, Section B, where streams <br />exist but where no base flood data has been provided or where base flood data has been provided <br />without floodways, the following provisions apply: <br /> <br />(1) When base flood elevation data or floodway data have not been provided in accordance with <br />Article 3, Section B, then the Building Official shall obtain, review and reasonably utilize <br />any base flood elevation and floodway data available from a Federal, State or other source, in <br />order to administer the provisions of Article 5. If data are not available from outside sources, <br />then the following provisions (2 & 3) shall apply: <br /> <br />(2) No encroachments, including fill material or structures, shall be located within areas of <br />special flood hazard, a distaflce oftwenty (20) feet eaeh side fr-em the top ofthe baak unless <br />certification by a registered professional engineer is provided demonstrating that the <br />cumulative effect of the proposed development when combined with all other existing and <br />anticipated development will not increase the water surface elevation ofthe base flood more <br />than one foot (I') at any point within the community. The engineering certification should <br />be supported bv technical data that conforms to standard hydraulic engineering principles. <br />such encroaehmem shall not result in any increase in flood levels duriBg the OeeWTeflCe of <br />the base flood discharge. <br /> <br />(3) lB Special Flood Hazard Areas without Base flood Elevation data, New construction aa6 or <br />substantial improvements of existing structures shall be elevated or flood-proofed to <br />elevations established in accordance with Article 4, Section CO!). have the lowest floor of <br />the lowest eBclosed area (iBe1uding basement) eleyated BO less thaB three (3) f-eet abo'le the <br />highest adjacent grade at the building site. <br /> <br />Flood Damage Prevention Ord. <br />Legislation/Ordinances/Attorney <br />10/2/01 --3:55 PM <br /> <br />18 <br />