My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2004-192
SIBFL
>
City Clerk
>
Ordinances
>
2004
>
Ordinance 2004-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2013 11:22:28 AM
Creation date
1/25/2006 4:41:07 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2004-192
Date (mm/dd/yyyy)
01/15/2004
Description
Amend Sec 265-34, 35, 36 of Zoning Code to Increase Price of
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Honorable City Commission <br /> December 18, 2003 <br /> Page 2 <br /> estimated total cost of capital projects, both planned and anticipated, as part of a long <br /> term goals and objectives that have been stated over time by the City Commission. <br /> This was looked at in relationship to land value and costs of participation units based on . <br /> current construction and square footage value of property. Bonus numbers were <br /> adjusted downwards to strike a balance between its per-unit relationship to land values <br /> versus the capital improvement needs of the City. In other words, the City's projected <br /> capital improvements are not as high as the full market land value, therefore the costs <br /> per square footage or unit, depending on how you want to look at it, for a bonus will still <br /> remain substantially less than the cost for a TDR. <br /> The existing bonus system category shall remain intact. They are beach access (which <br /> has no fee associated with the bonus program). Beach access trust fund which is .05 <br /> per participation unit for a maximum of .20 FAR; public beach recreation which has a <br /> .05 per participation unit for a maximum of .50 FAR; Collins Avenue Streetscape which <br /> has a .05 per participation unit for a maximum of .30 FAR; Sunny Isles Public Parking <br /> bonus which has a .05 per participation unit, maximum .20 FAR; and lastly, public <br /> oceanfront park bonus which has a .20 FAR for dedication of 10,000 square feet of <br /> beach park land to be used at the City's discretion. These categories remain the same <br /> for the MU-R district and for the applicable bonuses in the RMF-2 and B-1 districts, <br /> Under the previous RU-4A zoning from the County, .02 represented a unit of <br /> participation, which, at the time contemplated the average size of 871 square feet. That <br /> number is now .05 per participation unit for an average of 2178 square feet. For each <br /> .05 participation unit a developer is able to achieve 2.5 units at the 871 square feet <br /> which was the minimum size unit allowed under the old zoning. Therefore, when you <br /> divide the 871 by the $14,000 that would equal $16 per square feet. However, the <br /> square foot dollar amount was reduced when the value of the square foot was based on <br /> a participation unit of .05, which would result currently in a value of $6.42 per square <br /> foot. Extremely low as we all know. Following through with this thinking, you may <br /> deduct that if the .02 density increase in FAR bonus is increased to the .05 as <br /> proposed, the value of the FAR bonus per participation unit is increased accordingly <br /> which would result in a division between .02 and .05 per participation unit which would <br /> equal 2.5 units times the current participation unit cost of $14,000 which equals the <br /> $35,000 per participation unit. This valuation is still far less than the current market <br /> value per square foot of property, however it does balance the nexus between the City's <br /> long-term improvement needs and the cost of the bonus program. <br /> ADDITIONAL INFORMATION: <br /> I want to acknowledge and commend Jorge Vera for his assistance in this analysis. I <br /> had originally come up with the conceptual process and nexus between the Capital <br /> Improvement Program and the bonus program for which the final analysis was based <br /> on. Through his diligent work with the numbers, and our joint efforts with regard to the <br /> long term projections of capital needs within all the categories of our zoning ordinance <br /> Bonuses, we were able to come up with a balanced rationale for this increase to update <br /> the original calculations arrived at years ago through the planning process. <br /> CJR:ch C, 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.