My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2005-228
SIBFL
>
City Clerk
>
Ordinances
>
2005
>
Ordinance 2005-228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 2:53:22 PM
Creation date
1/25/2006 4:41:12 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2005-228
Date (mm/dd/yyyy)
05/12/2005
Description
Amd Ord. 2004-196; Revised Fee Schedule for Bldg Dept.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Building Department Fee Schedule <br /> <br />Fee Code Description <br />A. GENERAL INFORMATION ON SPECIAL FEES, <br />REFUNDS, EXTENSIONS AND CANCELLA TIONS <br /> <br />Amount <br /> <br />1. DOUBLE FEES <br /> <br />A-OOl <br /> <br />Any person who commences building, structural, $100.00 <br />electrical, gas, mechanical or plumbing system work <br />before obtaining the building official's approval by <br />means of a City-issued permit shall be subject to a <br />penalty of 100 percent (100%) of the usual permit <br />fee in addition to the required permit fees. When <br />work (for which a permit is required) is commenced <br />prior to obtaining a permit, the homeowner will be <br />required to pay the specified fee twice (double <br />permit fee) to the Buildin De artment before it will <br />issue the permit The payment of <br />the required fee shall not relieve the applicant from <br />being subject to any other penalties therein (code <br />enforcement fines may apply). The double fee <br />requirements shall be applicable to all divisions of <br />the Building Department as noted herein. <br /> <br />A-002 <br /> <br />If a permit applicant is found doing work without a $250.00 <br />permit as stated above in A-001 a second time, the <br />permit applicant shall be required to pay twice the <br />double fees plus the following amount. <br /> <br />A-003 <br /> <br />If a permit applicant is found doing work without a $500.00 <br />permit as stated above in A-001 a third time and any <br />other time thereafter, the permit applicant shall be <br />required to pay twice the double permit fee plus the <br />following amount. <br /> <br />2. RE-INSPECTION FEES <br /> <br />A-004 <br /> <br />Upon receipt of a permit, the permit holder shall be $fi5~gg <br />entitled to one (1) initial inspection for each <br />mandatory inspection. All work shall be inspected <br />and if any deficiency is found it shall be noted by the <br />inspector for correction by the contractor. When the <br />work described on the permit is partially completed, <br />an inspection shall be performed on those portions <br /> <br />Exhibit .. A .. <br /> <br />Buildin9 Department Fee Schedule - rev. 2/05 <br /> <br />Page I of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.