Laserfiche WebLink
<br />Building Department Fee Schedule <br /> <br />B...032 <br />8938 <br /> <br />B~033 <br />8939 <br />..;;034 <br />8 9~9 <br />B~Q35 <br />89U <br />8"0 '6 <br />~ 3. <br />8 9~:l <br /> <br />14(b} Pre-cast! Pre-stress $ 8.00 <br />(Roof - Floor - Walls) each 1,000 sq. ft. or fractional <br />part <br />14(c} Overhead Doors each $ 8.00 <br /> <br />14( d} Skylights Each $ 8.00 <br /> <br />14(e} Hand Rails/Stair Rails per linear feet $1.25 <br /> <br />14(f} Storefront / Fixed Glazing (Under 8 ft. high by $8.75 <br />4 ft. wide) each 100 sq. ft. or part (when no separate <br />permit is required) <br /> <br />B-037 <br />8 9~3 <br /> <br />14(g} Walk - in - Coolers each $ 100.00 <br /> <br />15. INSTALLATION I REPLACEMENT OF <br />VVINDOVVS, AN9 DOORS,ltAllalNCJS;O.ANb <br />SAFSGOARDS <br /> <br />B,;038 <br />8944 <br /> <br />B-038.a <br />B-039 <br />B~040 <br /> <br />B-041 <br />89U <br /> <br />B"042 <br /> <br />Window installation, alteration or repair - per sq. ft. of <br />window or door area (except new construction for <br />Group R) <br /> <br />$9,97 <br />$&r24 <br />$Q.25 <br /> <br />Minimum Fee <br /> <br />Impact wlnqowsor glass 'doors <br /> <br />Repla<:ElmElht of. broken Qlass. for windows and doors <br />per$100.0Mollars QfjQb value <br />Curtain Walls, Storefront, windows and doors <br />For each 100 sq. ft. or fractional part (except for New <br />Construction under 3 stories <br />Railings and Safeguards per $10Q;Q0 of job value <br /> <br />$100.00 <br />$9,31 <br />$0.30 <br />$2.50 <br />$8.75 <br /> <br />$2.50 <br /> <br />16. SCREEN ENCLOSURES, CANOPIES & <br />AWNINGS <br /> <br />8~043 <br />89U <br />B-044 <br /> <br />16(a) Screen enclosures: each 100 sq. ft. or fraction $12.00 <br /> <br />16(b} Free standing canopies: for each $1,000 of $12.00 <br /> <br />Building Department Fee Schedule - rev. 11/6 <br /> <br />Page 13 of 34 <br />