Laserfiche WebLink
<br />Building Department Fee Schedule <br />when square footage does not apply. <br /> <br />$0.05 <br /> <br />B-003 <br /> <br />When a building permit application is received for a <br />commercial project, the applicant shall pay an up- <br />front processing fee per 100 square feet or <br />fractional part, or a fee per each $100.00 of <br />estimated value or fractional part thereof. <br /> <br />$0.75 <br /> <br />B-003.a <br /> <br />Minimum Up-Front Processing Fee <br /> <br />$50.00 <br /> <br />All this processing fees are not refundable, but shall <br />be credited toward the final building permit fee. <br /> <br />2a. MINIMUM FEE FOR BUILDING PERMIT <br /> <br />B-004 <br /> <br />The minimum fee for all building permits is applicable <br />to all items in this section except as specified. <br /> <br />$199.99 <br />$125.00 <br /> <br />2a. ONE - ITEM LOW COST PERMIT FEE <br /> <br />B-005 <br /> <br />A permit fee for a one - item permit with a cost of <br />$1,000 or less <br /> <br />$35.00 <br /> <br />3. NEW BUILDING OR ADDITIONS <br /> <br />B-006 <br /> <br />Prefabricated utility shed (Max 100 sq. ft. of floor <br />area). <br /> <br />$75.00 <br /> <br />3a. SINGLE FAMILY AND DUPLEX (GROUP R) <br />ATTACHED I DETACHED STRUCTURES <br /> <br />B-007 <br /> <br />o to 100 sq. ft. in floor area <br /> <br />$199.99 <br />$125.00 <br /> <br />B-008 <br /> <br />101 to 300 sq. ft. in floor area. <br /> <br />$135.00 <br /> <br />B-009 <br /> <br />301 to 500 sq.ft.in floor area. <br /> <br />$160.00 <br /> <br />B-Ol0 <br /> <br />501 to 1000 sq. ft. in floor area. <br /> <br />$250.00 <br /> <br />Building Department Fee Schedule - rev. 07/10 <br /> <br />Page 10 of 37 <br />