My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2010-351
SIBFL
>
City Clerk
>
Ordinances
>
2010
>
Ordinance 2010-351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2010 2:41:54 PM
Creation date
9/28/2010 2:41:48 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2010-351
Date (mm/dd/yyyy)
09/16/2011
Description
Amd Chap. 156, Revised Fee Schedule for the Building Dept
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Building Department Fee Schedule <br /> <br />P-023 <br /> <br />P-024 <br />P-025 <br /> <br />$7.00 <br /> <br />Repairs to water piping <br />For each $1,000 estimated cost or fractional part <br /> <br />8. WELLS <br /> <br />Residential wells per well <br />Commercial wells per well <br /> <br />$75.00 <br />$100.0 <br /> <br />9. NATURAL GAS OR A LIQUEFIED PETROLEUM <br /> <br />P-026 <br /> <br />P-027 <br /> <br />For each outlet Group R (includes meters and <br />regulators) <br />For each appliance (does not include warm air heating <br />units, but does include un-vented space heaters and <br />vented wall heaters no duct works) <br /> <br />$8.00 <br />$8.00 <br /> <br />P-028 <br /> <br />Other Groups <br />For each outlet (includes meters and regulators) <br /> <br />$15.00 <br /> <br />For each meter (new or replacement) <br /> <br />$ 8.00 <br /> <br />P-029 <br /> <br />P-030 <br /> <br />$50.00 <br /> <br />For major repairs to gas pipe where no fixtures or <br />appliance installation is involved <br /> <br />P-031 <br /> <br />$75.00 <br /> <br />P-032 <br /> <br />P-033 <br /> <br />P-034 <br /> <br />P-035 <br /> <br />Underground L.P. gas tanks per group of tanks at a <br />single location <br /> <br />Above ground L.P. gas tanks per group of tanks at a <br />single location <br /> <br />$100.00 <br /> <br />10. WATER TREATMENT PLANTS, PUMPING <br />STATIONS, SEWER TREATMENTS AND LIFT <br />STATIONS <br /> <br />Water treatment plant (interior plant piping) <br /> <br />$250.00 <br /> <br />Sewage treatment plan (interior plant piping) <br /> <br />$200.00 <br /> <br />Lift station (interior station piping) <br /> <br />$300.00 <br /> <br />Building Department Fee Schedule - rev. 07/10 <br /> <br />Page 21 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.