Laserfiche WebLink
<br />Building Department Fee Schedule <br /> <br />EL-001 <br /> <br />EL-001.a <br /> <br />1. MINIMUM ELECTRICAL PERMIT FEE <br />INCLUDING REPAIR WORK PER PERMIT. <br /> <br />Except as otherwise specified this minimum does not <br />apply to supplemental Electrical permits issued as <br />supplementary to current outstanding permits for the <br />same job and demolition work). <br /> <br />Any project that does not conform to permit fee shall <br />be calculated @ 2.5% of total job value. <br /> <br />$199.99 <br />$125.00 <br /> <br />2.50/0 <br /> <br />1a. ONE - ITEM LOW COST PERMIT FEE <br /> <br />EL-002 <br /> <br />$35.00 <br /> <br />A permit fee for a one - item permits with a cost of <br />$1000 or less. <br /> <br />EL-003 <br /> <br />2. RESIDENTIAL I COMMERCIAL (CONDO, NEW <br />CONSTRUCTION) <br /> <br />All electrical within unit per square feet, except all <br />common areas. <br /> <br />$0.15 <br /> <br />EL-004 <br /> <br />$0.12 <br /> <br />3. RESIDENTIAL: (Remodeling, condo, house, new <br />house) per square feet, not including service or special <br />systems. <br /> <br />EL-005 <br /> <br />$26.50 <br /> <br />EL-006 <br />EL-006.a <br />EL-006.b <br />EL-006.c <br /> <br />EL-007 <br /> <br />EL-007.a <br /> <br />EL-007.b <br /> <br />4. AC: HEAT <br /> <br />5. AC: COOL <br /> <br />First Ton <br />Two Tons to Ten Tons (per ton) <br />Ten Tons or Greater (per ton) <br />Maximum Fee <br /> <br />6. MOTORS: PER HORSE POWER <br /> <br />One horse power or less <br /> <br />Two horse power to ten horse power (per Horse <br />Power) <br />Ten horse power or more (per Horse Power) <br /> <br />Building Department Fee Schedule - rev. 07/10 <br /> <br />Page 23 of 37 <br /> <br />$9.00 <br />$3.70 <br />$2.25 <br />$175.00 <br /> <br />$9.00 <br />$3.70 <br />$2.25 <br />