Laserfiche WebLink
<br />Building Department Fee Schedule <br /> <br />MC-035 <br /> <br />Per ride <br /> <br />$95.00 <br /> <br />MC-036 <br /> <br />For each permanent unit installed or altered <br /> <br />$75.00 <br /> <br />MC-037 <br /> <br />$75.00 <br /> <br />Annual inspection for each ride or device at anyone <br />location (permanent installation only) <br /> <br />MC-038 <br /> <br />MC-039 <br /> <br />14. BOILERS AND PRESSURE VESSELS <br /> <br />Installation permits fees (including initial inspections <br />and certificate). Does not include installation or <br />connection of fuel and water lines. <br /> <br />The following fees apply to each boiler to be installed <br /> <br />Boilers less than 837 MBTU - each <br /> <br />$86.09 <br />$90.00 <br /> <br />$193.99 <br />$110.00 <br /> <br />Boilers 837 MBTU to 6,695 MBTU - each <br /> <br />MC-040 <br /> <br />Boilers 6,695 MBTU and up - each <br /> <br />$143.99 <br />$150.00 <br /> <br />MC-041 <br /> <br />Steam driven prime movers - each <br /> <br />$69.99 <br />$75.00 <br /> <br />MC-042 <br /> <br />Steam actuated machinery - each <br /> <br />$69.99 <br />$75.00 <br /> <br />MC-043 <br /> <br />Unfired pressure vessels (operating at pressures in <br />excess of 60 PSI and having volume of more than 5 cu. <br />ft.) each pressure vessel. <br /> <br />$86.99 <br />$90.00 <br /> <br />15. FEES FOR PERIODIC RE-INSPECTIONS <br /> <br />MC-044 <br /> <br />Steam boilers (annual) - each <br /> <br />$143.99 <br />$150.00 <br /> <br />MC-045 <br /> <br />Hot water boilers (annual) - each <br /> <br />$69.99 <br /> <br />Building Department Fee Schedule - rev. 07/10 <br /> <br />Page 31 of 37 <br />