My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2009-1495
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2009
>
Reso 2009-1495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2010 11:13:54 AM
Creation date
9/30/2010 11:12:10 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2009-1495
Date (mm/dd/yyyy)
10/29/2009
Description
Bid 09-09-01/Agmt w/Tenex: Median Closure/Collins Ave Streetscape Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. Furnish, Install, Perform, Provide <br /> <br />1. The word "furnish," when used in connection <br />with services, materials, or equipment, shall mean to <br />supply and deliver said services, materials, or equipment <br />to the Site (or some other specified location) ready for use <br />or installation and in usable or operable condition. <br /> <br />2. The word "install," when used in connection <br />with services, materials, or equipment, shall mean to put <br />into use or place in fmal position said services, materials, <br />or equipment complete and ready for intended use. <br /> <br />3. The words "perfonn" or "provide," when used <br />in connection with services, materials, or equipment, shall <br />mean to furnish and install said services, materials, or <br />equipment complete and ready for intended use. <br /> <br />4. When "furnish," "install," "perfonn," or "pro- <br />vide" is not used in connection with services, materials, or <br />equipment in a context clearly requiring an obligation of <br />Contractor, "provide" is implied. <br /> <br />F. Unless stated otherwise in the Contract Docu- <br />ments, words or phrases which have a well-known <br />technical or construction industry or trade meaning are <br />used in the Contract Documents in accordance with such <br />recognized meaning. <br /> <br />ARTICLE 2 - PRELIMINARY MAITERS <br /> <br />2.0 I Delivery of Bonds and Evidence of Insurance <br /> <br />A. When Contractor delivers the executed <br />counterparts of the Agreement to Owner, Contractor shall <br />also deliver to Owner such bonds as Contractor may be <br />required to furnish. <br /> <br />B. Evidence of Insurance: Before any Work at <br />the Site is started, Contractor and Owner shall each <br />deliver to the other, with copies to each additional insured <br />identified in the Supplementary Conditions, certificates of <br />insurance (and other evidence of insurance which either <br />of them or any additional insured may reasonably request) <br />which Contractor and Owner respectively are required to <br />purchase and maintain in accordance with Article 5. <br /> <br />2.02 <br /> <br />Copies of Documents <br /> <br />or, if a Notice to Proceed is given, on the day indicated in <br />the Notice to Proceed. A Notice to Proceed may be given <br />at any time within 30 days after the Effective Date of the <br />Agreement. In no event will the Contract Times com- <br />mence to run later than the sixtieth day after the day of <br />Bid opening or the thirtieth day after the Effective Date of <br />the Agreement, whichever date is earlier. <br /> <br />2.04 Starting the Work <br /> <br />A. Contractor shall start to perfonn the Work on <br />the date when the Contract Times commence to run. No <br />Work shall be done at the Site prior to the date on which <br />the Contract Times commence to run. <br /> <br />2.05 Before Starting Construction <br /> <br />A. Preliminary Schedules: Within 10 days after <br />the Effective Date of the Agreement (unless otherwise <br />specified in the General Requirements), Contractor shall <br />submit to Engineer for timely review: <br /> <br />1. a preliminary Progress Schedule; indicating <br />the times (numbers of days or dates) for starting and <br />completing the various stages of the Work, including any <br />Milestones specified in the Contract Documents; <br /> <br />2. a preliminary Schedule of Submittals; and <br /> <br />3. a preliminary Schedule of Values for all of the <br />Work which includes quantities and prices of items which <br />when added together equal the Contract Price and subdi- <br />vides the Work into component parts in sufficient detail to <br />serve as the basis for progress payments during <br />perfonnance of the Work. Such prices will include an <br />appropriate amount of overhead and profit applicable to <br />each item of Work. <br /> <br />2.06 Preconstruction Conference <br /> <br />A. Before any Work at the Site is started, a <br />conference attended by Owner, Contractor, Engineer, and <br />others as appropriate will be held to establish a working <br />understanding among the parties as to the Work and to <br />discuss the schedules referred to in Paragraph 2.05.A, <br />procedures for handling Shop Drawings and other <br />submittals, processing Applications for Payment, and <br />maintaining required records. <br /> <br />2.07 <br /> <br />Initial Acceptance of Schedules <br /> <br />A. At least 10 days before submission of the first <br />Application for Payment a conference attended by <br />Contractor, Engineer, and others as appropriate will be <br />held to review for acceptability to Engineer as provided <br />below the schedules submitted in accordance with <br />Paragraph 2.05.A. Contractor shall have an additional 10 <br />days to make corrections and adjustments and to complete <br />and resubmit the schedules. No progress payment shall be <br />A. The Contract Times will commence to run on made to Contractor until acceptable schedules are <br />the thirtieth day after the Effective Date of the Agreement submitted to Engineer. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright lid 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 9 <br /> <br />A. Owner shall furnish to Contractor up to ten <br />printed or hard copies of the Drawings and Project <br />Manual. Additional copies will be furnished upon request <br />at the cost of reproduction. <br /> <br />2.03 Commencement of Contract Times; Notice to <br />Proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.