<br />c. Contractor failed to give the written notice as <br />required by Paragraph 4.03.A. <br /> <br />3. If Owner and Contractor are unable to agree <br />on entitlement to or on the amount or extent, if any, of <br />any adjustment in the Contract Price or Contract Times, <br />or both, a Claim may be made therefor as provided in <br />Paragraph 10.05. However, Owner and Engineer, and any <br />of their Related Entities shall not be liable to Contractor <br />for any claims, costs, losses, or damages (including but <br />not limited to all fees and charges of engineers, architects, <br />attorneys, and other professionals and all court or <br />arbitration or other dispute resolution costs) sustained by <br />Contractor on or in connection with any other project or <br />anticipated project. <br /> <br />4.04 Underground Facilities <br /> <br />A. Shown or Indicated: The information and data <br />shown or indicated in the Contract Documents with <br />respect to existing Underground Facilities at or <br />contiguous to the Site is based on information and data <br />furnished to Owner or Engineer by the owners of such <br />Underground Facilities, including Owner, or by others. <br />Unless it is otherwise expressly provided in the Sup- <br />plementary Conditions: <br /> <br />1. Owner and Engineer shall not be responsible <br />for the accuracy or completeness of any such information <br />or data; and <br /> <br />2. the cost of all of the following will be <br />included in the Contract Price, and Contractor shall have <br />full responsibility for: <br /> <br />a. reviewing and checking all such information <br />and data, <br /> <br />b. locating all Underground Facilities shown or <br />indicated in the Contract Documents, <br /> <br />c. coordination of the Work with the owners of <br />such Underground Facilities, including Owner, <br />during construction, and <br /> <br />d. the safety and protection of all such Under- <br />ground Facilities and repairing any damage <br />thereto resulting from the Work. <br /> <br />B. Not Shown or Indicated <br /> <br />promptly review the Underground Facility and determine <br />the extent, if any, to which a change is required in the <br />Contract Documents to reflect and document the <br />consequences of the existence or location of the Under- <br />ground Facility. During such time, Contractor shall be <br />responsible for the safety and protection of such <br />Underground Facility. <br /> <br />2. If Engineer concludes that a change in the <br />Contract Documents is required, a Work Change <br />Directive or a Change Order will be issued to reflect and <br />document such consequences. An equitable adjustment <br />shall be made in the Contract Price or Contract Times, or <br />both, to the extent that they are attributable to the <br />existence or location of any Underground Facility that <br />was not shown or indicated or not shown or indicated <br />with reasonable accuracy in the Contract Documents and <br />that Contractor did not know of and could not reasonably <br />have been expected to be aware of or to have anticipated. <br />If Owner and Contractor are unable to agree on <br />entitlement to or on the amount or extent, if any, of any <br />such adjustment iri Contract Price or Contract Times, <br />Owner or Contractor may make a Claim therefor as <br />provided in Paragraph 10.05. <br /> <br />4.05 Reference Points <br /> <br />A. Owner shall provide engineering surveys to <br />establish reference points for construction which in <br />Engineer's judgment are necessary to enable Contractor <br />to proceed with the Work. Contractor shall be responsible <br />for laying out the Work, shall protect and preserve the <br />established reference points and property monuments, and <br />shall make no changes or relocations without the prior <br />written approval of Owner. Contractor shall report to <br />Engineer whenever any reference point or property <br />monument is lost or destroyed or requires relocation <br />because of necessary changes in grades or locations, and <br />shall be responsible for the accurate replacement or <br />relocation of such reference points or property <br />monuments by professionally qualified personnel. <br /> <br />4.06 <br /> <br />Hazardous Environmental Condition at Site <br /> <br />A. Reports and Drawings: Reference is made to <br />the Supplementary Conditions for the identification of <br />those reports and drawings relating to a Hazardous <br />Environmental Condition identified at the Site, if any, that <br />have been utilized by the Engineer in the preparation of <br />the Contract Documents. <br /> <br />1. If an Underground Facility is uncovered or <br />revealed at or contiguous to the Site which was not shown <br />or indicated, or not shown or indicated with reasonable <br />accuracy in the Contract Documents, Contractor shall, <br />promptly after becoming aware thereof and before further <br />disturbing conditions affected thereby or performing any <br />Work in connection therewith (except in an emergency as <br />required by Paragraph 6.16.A), identify the owner of such <br />Underground Facility and give written notice to that <br />owner and to Owner and Engineer. Engineer will <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright @ 2002 National Society of Professional Engineers for EJCnc. All rights reserved. <br />00700 - 13 <br /> <br />B. Limited Reliance by Contractor on Technical <br />Data Authorized: Contractor may rely upon the general <br />accuracy of the "technical data" contained in such reports <br />and drawings, but such reports and drawings are not <br />Contract Documents. Such "technical data" is identified <br />in the Supplementary Conditions. Except for such reliance <br />on such "technical data," Contractor may not rely upon or <br />make any claim against Owner or Engineer, or any of <br />their Related Entities with respect to: <br />