Laserfiche WebLink
<br />Documents, the objecting party shall so notify the other <br />party in writing within 10 days after receipt of the <br />certificates (or other evidence requested) required by <br />Paragraph 2.0l.B. Owner and Contractor shall each <br />provide to the other such additional information in respect <br />of insurance provided as the other may reasonably <br />request. If either party does not purchase or maintain all <br />of the bonds and insurance required of such party by the <br />Contract Documents, such party shall notify the other <br />party in writing of such failure to purchase prior to the <br />start of the Work, or of such failure to maintain prior to <br />any change in the required coverage. Without prejudice to <br />any other right or remedy, the other party may elect to <br />obtain equivalent bonds or insurance to protect such other <br />party's interests at the expense of the party who was <br />required to provide such coverage, and a Change Order <br />shall be issued to adjust the Contract Price accordingly. <br /> <br />5.10 Partial Utilization, Acknowledgment of Property <br />Insurer <br /> <br />A. If Owner finds it necessary to occupy or use a <br />portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in Paragraph <br />14.05, no such use or occupancy shall commence before <br />the insurers providing the property insurance pursuant to <br />Paragraph 5.06 have acknowledged notice thereof and in <br />writing effected any changes in coverage necessitated <br />thereby. The insurers providing the property insurance <br />shall consent by endorsement on the policy or policies, <br />but the property insurance shall not be canceled or <br />permitted to lapse on account of any such partial use or <br />occupancy. <br /> <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br /> <br />6.01 Supervision and Superintendence <br /> <br />A. Contractor shall supervise, inspect, and direct <br />the Work competently and efficiently, devoting such <br />attention thereto and applying such skills and expertise as <br />may be necessary to perform the Work in accordance with <br />the Contract Documents. Contractor shall be solely <br />responsible for the means, methods, techniques, <br />sequences, and procedures of construction. Contractor <br />shall not be responsible for the negligence of Owner or <br />Engineer in the design or specification of a specific <br />means, method, technique, sequence, or procedure of <br />construction which is shown or indicated in and expressly <br />required by the Contract Documents. <br /> <br />B. At all times during the progress of the Work, <br />Contractor shall assign a competent resident superin- <br />tendent who shall not be replaced without written notice <br />to Owner and Engineer except under extraordinary <br />circumstances. The superintendent will be Contractor's <br />representative at the Site and shall have authority to act on <br />behalf of Contractor. All communications given to or <br /> <br />received from the superintendent shall be binding on <br />Contractor. <br /> <br />6.02 Labor; Working Hours <br /> <br />A. Contractor shall provide competent, suitably <br />qualified personnel to survey and layout the Work and <br />perform construction as required by the Contract Docu- <br />ments. Contractor shall at all times maintain good disci- <br />pline and order at the Site. <br /> <br />B. Except as otherwise required for the safety or <br />protection of persons or the Work or property at the Site <br />or adjacent thereto, and except as otherwise stated in the <br />Contract Documents, all Work at the Site shall be <br />performed during regular working hours. Contractor will <br />not permit the performance of Work on a Saturday, <br />Sunday, or any legal holiday without Owner's written <br />consent (which will not be unreasonably withheld) given <br />after prior written notice to Engineer. <br /> <br />6.03 Services, Materials, and Equipment <br /> <br />A. Unless otherwise specified in the Contract <br />Documents, Contractor shall provide and assume full <br />responsibility for all services, materials, equipment, labor, <br />transportation; construction equipment and machinery, <br />tools, appliances, fuel, power, light, heat, telephone, <br />water, sanitary facilities, temporary facilities, and all other <br />facilities and incidentals necessary for the performance, <br />testing, start-up, and completion of the Work. <br /> <br />B. All materials and equipment incorporated into <br />the Work shall be as specified or, if not specified, shall be <br />of good quality and new, except as otherwise provided in <br />the Contract Documents. All special warranties and <br />guarantees required by the Specifications shall expressly <br />run to the benefit of Owner. If required by Engineer, <br />Contractor shall furnish satisfactory evidence (including <br />reports of required tests) as to the source, kind, and <br />quality of materials and equipment. <br /> <br />C. All materials and equipment shall be stored, <br />applied, installed, connected, erected, protected, used, <br />cleaned, and conditioned in accordance with instructions <br />of the applicable Supplier, except as otherwise may be <br />provided in the Contract Documents. <br /> <br />6.04 Progress Schedule <br /> <br />A. Contractor shall adhere to the Progress <br />Schedule established in accordance with Paragraph 2.07 <br />as it may be adjusted from time to time as provided <br />below. <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright@ 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 18 <br />