<br />c) whether or not incorporation or use <br />of the proposed substitute item in con- <br />nection with the Work is subject to <br />payment of any license fee or royalty; <br /> <br />3) will identify: <br /> <br />a) all variations of the proposed <br />substitute item from that specified, and <br /> <br />b) available engineering, sales, <br />maintenance, repair, and replacement <br />services; <br /> <br />4) and shall contain an itemized esti- <br />mate of all costs or credits that will result <br />directly or indirectly from use of such substitute <br />item, including costs of redesign and claims of <br />other contractors affected by any resulting <br />change, <br /> <br />B. Substitute Construction Methods or Proce- <br />dures: If a specific means, method, technique, sequence, <br />or procedure of construction is expressly required by the <br />Contract Documents, Contractor may furnish or utilize a <br />substitute means, method, technique, sequence, or <br />procedure of 'construction approved by Engineer. <br />Contractor shall submit sufficient information to allow <br />Engineer, in Engineer's sole discretion, to determine that <br />the substitute proposed is equivalent to that expressly <br />called for by the Contract Documents. The requirements <br />for review by Engineer will be similar to those provided <br />in Paragraph 6.05.A.2. <br /> <br />C. Engineer's Evaluation: Engineer will be <br />allowed a reasonable time within which to evaluate each <br />proposal or submittal made pursuant to Paragraphs 6.05.A <br />and 6.05.B. Engineer may require Contractor to furnish <br />additional data about the proposed substitute item. <br />Engineer will be the sole judge of acceptability. No "or <br />equal" or substitute will be ordered, installed or utilized <br />until Engineer's review is complete, which will be <br />evidenced by either a Change Order for a substitute or an <br />approved Shop Drawing for an "or equal." Engineer will <br />advise Contractor in writing of any negative <br />detennination. <br /> <br />D. Special Guarantee: Owner may require <br />Contractor to furnish at Contractor's expense a special <br />perfonnance guarantee or other surety with respect to any <br />substitute. <br /> <br />Documents (or in the prOVlSlons of any other direct <br />contract with Owner) resulting from the acceptance of <br />each proposed substitute. <br /> <br />F. Contractor's Expense: Contractor shall <br />provide all data in support of any proposed substitute or <br />"or-equal" at Contractor's expense. <br /> <br />6.06 Concerning Subcontractors, Suppliers, and <br />Others <br /> <br />A. Contractor shall not employ any Subcon- <br />tractor, Supplier, or other individual or entity (including <br />those acceptable to Owner as indicated in Paragraph <br />6.06.B), whether initially or as a replacement, against <br />whom Owner may have reasonable objection. Contractor <br />shall not be required to employ any Subcontractor, <br />Supplier, or other individual or entity to furnish or <br />perfonn any of the Work against whom Contractor has <br />reasonable objection. <br /> <br />B. If the Supplementary Conditions require the <br />identity of certain Subcontractors, Suppliers, or other <br />individuals or entities to be submitted to Owner in <br />advance for acceptance by Owner by a specified date <br />prior to the Effective Date of the Agreement, and if <br />Contractor has submitted a list thereof in accordance with <br />the Supplementary Conditions, Owner's acceptance <br />(either in writing or by failing to make written objection <br />thereto by the date indicated for acceptance or objection <br />in the Bidding Documents or the Contract Documents) of <br />any such Subcontractor, Supplier, or other individual or <br />entity so identified may be revoked on the basis of reason- <br />able objection after due investigation. Contractor shall <br />submit an acceptable replacement for the rejected <br />Subcontractor, Supplier, or other individual or entity, and <br />the Contract Price will be adjusted by the difference in the <br />cost occasioned by such replacement, and an appropriate <br />Change Order will be issued. No acceptance by Owner of <br />any such Subcontractor, Supplier, or other individual or <br />entity, whether initially or as a replacement, shall consti- <br />tute a waiver of any right of Owner or Engineer to reject <br />defective Work. <br /> <br />C. Contractor shall be fully responsible to Owner <br />and Engineer for all acts and omissions of the <br />Subcontractors, Suppliers, and other individuals or <br />entities perfonning or furnishing any of the Work just as <br />Contractor is responsible for Contractor's own acts and <br />omissions. Nothing in the Contract Documents: <br /> <br />1. shall create for the benefit of any such <br />Subcontractor, Supplier, or other individual or entity any <br />contractual relationship between Owner or Engineer and <br />any such Subcontractor, Supplier or other individual or <br />entity, nor <br /> <br />E. Engineer's Cost Reimbursement: Engineer <br />will record Engineer's costs in evaluating a substitute <br />proposed or submitted by Contractor pursuant to <br />Paragraphs 6.05.A.2 and 6.05.B Whether or not Engineer <br />approves a substitute item so proposed or submitted by <br />Contractor, Contractor shall reimburse Owner for the 2. shall anything in the Contract Documents <br />charges of Engineer for evaluating each such proposed create any obligation on the part of Owner or <br />substitute. Contractor shall also reimburse Owner for the Engineer to payor to see to the payment of any moneys <br />charges of Engineer for making changes in the Contract due any such Subcontractor, Supplier, or other individual <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright <<:> 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 20 <br />