My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Aya Solutions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-09-01 Canopy for Government Center
>
Responses
>
Aya Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2010 1:59:37 PM
Creation date
11/3/2010 1:51:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design/Construct Canopy at Government Center
Bid No. (xx-xx-xx)
10-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />W~h~ <br /> <br />eERTIFIED GENERAL eONTRACTOR - eGC # 1512270 <br />CERTIFIED ROOFING eONTRACTOR -cec # 1328084 <br /> <br />2. Work Experience <br /> <br />JANE A. HINES, CMC <br />CITY CLERK - SUNNY ISLES BEACH <br />GOVERNMENT CENTER <br />18070 COLLINS AVENUE <br />SUNNY ISLES BEACH, FL 33160 <br /> <br />We are pleased to provide you with our proposal for the design, engineering, fabrication and installation of a <br />canopy structure to be located at the City of Sunny Isles Beach Government Center. We propose to install a <br />Tensile Membrane Structure. This solution would enhance the front of the building and match the <br />architectural shape of the fa~ade. The area to cover is 800 square feet approximately and our designs have not <br />columns or footings. We attach a schematic of the membrane. <br /> <br />THE MA TERIALS <br /> <br />The fabric will be " Precontraint 702" of Ferrari white color. This is a fire resist fabric with 5 years guarantee. <br />Attach the technical information of this product. This is the best water proof material for this purpose. The <br />frame will be cables, hardware and steel pipes galvanized, full welded, with base and paint finish. The <br />engineering will meet the latest edition of FBC for 75 MPH winds. Fabric must be removed when winds get <br />above 75MPH. <br /> <br />Our engineers are in business for this specific job for more of 25 years. Some jobs for the past 5 years in <br />successfully designing and constructing similar or major are: <br /> <br />. Big Fish restaurant - Miami FL. Area: 3500 SQF. Pino Bottiglieri. Tel 305 7767636. Attach photography. <br />(This job is an Award of Excellence 2006 from Industrial Fabric Association International-IFAI) <br /> <br />. Hotel Hilton Bentley-South Beach FL. Area 6000 SQF. Cecilia Ocampo Tel. 305 523 3344 <br /> <br />. Palmetto Business Center - Miami FL. Area 3800 SQF. Teo Rosell Tel 305 5921210 <br /> <br />. Loft of Brickell- Miami FL. Area 1500 SQF. Alfredo Acosta Tel 305 4674087 <br /> <br />. Queen's Flowers - Miami FL. Area 3500 SQF. Felipe Sanchez Tel. 305 5912113 <br /> <br />. Benigans Restaurant - Panama RP. Area. 3000 SQF. Fernando Nino Tel 1-507 64568566 <br /> <br />. LA 14 Malls - Bogota-Colombia. Area 60,000 SQF under Construction. <br /> <br />IQR NA="^L <br />IIUI~ <br /> <br />Aya Solutions Ine. <br />3001 W. Hallandale Beach Blvd, Suite 310 <br />Pembroke Park. FI 33009 <br />PH 305 7926720 FAX 305 792 2267 <br />www.ayasolutionsinc.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.