My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Williams Paving Co., Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-08-01 Central Island Outfalls
>
Responses
>
Williams Paving Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2010 10:12:16 AM
Creation date
11/4/2010 10:11:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />QUALIFICATIONS AND EXPERIENCE OF TEAM <br /> <br />- <br /> <br />ALAN LAUDERDALE <br />Site Foreman <br /> <br />Alan "AI" Lauderdale has been in the <br />construction industry since 1973, After finishing <br />his service with the United States Marine Corps, <br />AI began working for an engineering contractor <br />laying pipelines and underground utilities, His <br />strong ethic and desire to succeed enabled him <br />to master every aspect of the underground <br />utility industry. He has experience in deep utility <br />installation, pipe jacking and boring, pump <br />facilities as well as the auxiliary construction <br />activities and methodology. <br /> <br />RECENT PROJECT EXPERIENCE <br /> <br />NW 138th Street Reconstruction, City of <br />Hialeah <br /> <br />$ 12,lM - 1.25 MI of roadway <br />reconstruction, including canal relocation, <br />underground utilities, base, asphalt, <br />concrete curbs and sidewalk, lighting and <br />signal <br /> <br />NW 15th Avenue Reconstruction, Miami- <br />Dade County $7.8M - roadway widening <br />and reconstruction NE 159th Street to NE <br />186th Street including bridge widening, <br />underground utilities, base, asphalt, <br />concrete curbs and sidewalk, lighting and <br />signal <br /> <br />NW 9ih Avenue Construction, City of <br />Hialeah <br /> <br />$8,5M - 1,25 MI of new roadway <br />construction including underground <br />utilities, base, asphalt, concrete curbs and <br />sidewalk, lighting and signal <br /> <br />W 8th Avenue Reconstruction, City of <br />Hialeah <br /> <br />$5.5M - 3.0 MI of roadway reconstruction <br />including bridge reconstruction, <br />underground utilities, base, asphalt, <br />concrete curbs and sidewalk, lighting and <br />signal <br /> <br />SR 84 Slip Ramp Construction, FOOT - <br />District 4 <br /> <br />$3,8M - construction new ingress <br />ramp from SR 84 to 1-595 including <br />widening of 1-595 and widening of <br />the 1-75/1-595 connector ramp <br /> <br />NW 56th Avenue Reconstruction - City <br />of Lauderhill <br /> <br />$7.5M - 2.25 MI roadway <br />reconstruction underground utilities, <br />base, asphalt, concrete curbs and <br />sidewalk, lighting and signal <br /> <br />CAREER HIGHLIGHTS <br /> <br />36 years background in <br />underground utility construction <br /> <br />PROFESSIONAL EXPERIENCE <br /> <br />Heavy equipment operator <br /> <br />Pipe layer <br /> <br />r.v'LL'A/IWI!!!!; ~ <br />,.,.."_..~_.-.w~".,,,~ ~a.,~. <br /> <br />VI <br />..... <br />C <br />QJ <br />E <br />QJ <br />> <br />o <br />~ <br />E <br /> <br />~ <br />III <br />'t:; <br />~ <br />o <br />>- <br />u <br />C <br />QJ <br />l:D <br />QJ <br />E <br />LLJ <br />"0 <br />C <br />.!l1 <br />.!!! <br /> <br />III <br />.... <br />..... <br />C <br />QJ <br />U <br />QJ <br />.s= <br />..... <br />.... <br />o <br />- <br />VI <br />QJ <br />U <br />.~ <br />QJ <br />VI <br />C <br />o <br />~ <br />u <br />2 <br />..... <br />VI <br />C <br />o <br />U <br />III <br />C <br />o <br />'Vi <br />VI <br />QJ <br />- <br />e <br />"- <br />.-i <br />o <br />00 <br />o <br />6 <br />.-i <br />ci <br />Z <br />"- <br />LL. <br />cr: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.