Laserfiche WebLink
<br />- <br /> <br />DESCRIPTION OF CURRENT AND PREVIOUS EXPERIENCE ON A PROJECT SIMILAR TO THE <br />CENTRAL ISLAND EMERGENCY OUTFALL IMPROVEMENT PROJECT <br /> <br />City of Sunny Isles Beach <br /> <br />City of Miami <br /> <br />City of Hialeah <br /> <br />Town of Golden Beach <br /> <br />Town of Bay Harbor Islands <br /> <br />Drainage & Street Improvements <br /> <br />This Project is located along the north end by NE 182rd Street, along the <br />south by NE 174th Street and the Dumfoundling Bay and Collins Ave. <br />along the west and east respectively. <br /> <br />The Project consist of the following: Milling and resurfacing, pavement <br />reconstruction of all the local streets. Design and construction of a new <br />storm sewer system and Establishing a network of drainage deep wells <br />for discharge of the storm water runoff. <br /> <br />Fairlawn Storm Sewer Improvement Phase III <br /> <br />Project B-50704 <br /> <br />The location of the Project is in the boundary of West Flagler Street and <br />SW 8th ST between SW 56th Ave. and SW 47th Ave and West Flagler St <br />and NW 5th ST between NW 52 Ave. and NW 50th Ave. <br /> <br />The scope of work includes construction of new storm drain that <br />connects to an existing drainage, roadway milling and resurfacing, ADA <br />ramps installation and damaged sidewalk replacement, re-grade and/or <br />reconstruct swale areas to street blocks impacted by drainage <br />improvements activities <br /> <br />East 4th Avenue-from E 25th ST to East 32nd ST <br /> <br />This Project is located at East 4th Avenue-from E 25th ST to East 32nd ST <br /> <br />The Project consist of the complete reconstruction of East 4th Ave., <br />including new sidewalk, curb and gutter and drainage improvements <br />consisting of new draining inlets, 18" storm sewer cross drainage pipe, <br />and Exfiltration trench (French-drain). Also proposed in the project <br />scope are pavement milling and resurfacing. <br /> <br />Golden Beach Drive Streetscape Improvements, Town-wide storm water <br />improvements, water improvements, water main reconstruction and <br />underground conversion of utilities. <br /> <br />Work for this contract include: Golden Beach Drive Streetscape (re- <br />alignment of road, new concrete curb and gutter, 7 ft wide sidewalk, <br />landscaping improvement, irrigation, and relocation of existing street <br />lights); Town-wide storm water drainage improvements(installation <br />of structures and construction of pump station and outfalls to intra- <br />costal); Town wide replacement of water main with new 8" D.I.P. <br />water-main and conduit installation for undergrounding of utilities <br />(FPL, AT & T, and Atlantic Broad Band.) <br /> <br />Community Enhancement PH-3 Utility Improvements <br /> <br />Work for this contract include all items necessary for the construction of <br />new water main and services in existing roadways, including saw-cut <br />the road before excavating trenches for pipes and shall be responsible <br />for temporary restoration of the asphalt surfaces and final restoration. <br />