Laserfiche WebLink
<br />11. With all the attachments that are there too, you want all of those unbound as well, and all one <br />big clip, or do you want all the financial statements separate, etc.? <br />Put them all together with a clip, and put the ten pages on the top, and everything that <br />substantiates it underneath, that way we can quickly go through them, it is a little <br />easier to store them, etc. <br /> <br />12. There is one original and four copies, and all five are unbound and clipped together, is that <br />correct? <br />Yes, that is correct, and then we can hand out those copies to the people who are <br />reviewing them and then they can go through them very easily. <br /> <br />As a side note, when we did this last time, a lot of firms would call up and say, when do <br />I get my job. This is not one of those rotation things, what we are looking for are <br />specific services. If it turns out that we didn't need a structural or a geotechnical that <br />entire period of time, then we didn't need it. We will use you if we get the chance. It <br />also tells us that you are a firm that we like, and so when someone submits on a larger <br />project and they need a structural, and we thought you were a good structural and we <br />look and see you are a part of their team. That can be a plus, and so it is not a loss <br />even if we don't necessarily use you under this program. <br /> <br />13. What is the duration of these contracts? <br />Our desire is to have them go for about two years. We are still working with the City <br />Attorney's Office on that. We have had that discussion and we will finalize that. <br /> <br />14. Will there be individual negotiations for the fees and the rates? <br />Yes, obviously your professional services are guided by law, and we will follow those <br />regulations. <br /> <br />15. Are you going to email out a list of the today's attendees? <br />We do everything on Demandstar.com, and staff is wonderful about getting the <br />information posted. They will have the list of attendees and the minutes posted on <br />Demand Star fairly quickly. Do not call and ask if we have it yet because if it is not on <br />Demand Star then we don't have it yet. The moment we have it we will post it. Just <br />keep checking the site. <br /> <br />16. Do you anticipate having any federal funds and do you anticipate to use those through this <br />contract? <br />Again, the reason this group is here is for projects that we don't even know we need <br />yet. If it is a large project, we are going to have a specific RFQ process for that <br />project. The whole point of this process is that we don't know what is going to come <br />tomorrow and we want to be try be prepared. <br /> <br />17. Have you received federal funds recently? <br />We are finishing up a project now on federal funds, but again, those are the larger <br />projects that we will go out specifically for. <br /> <br />j\ddendum No.1 Mandatory l're-Submittal Conference QA OSOSlOl'age 5 of 6 <br />