My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J. Milton & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-10-01 Aquarium and Parking
>
J. Milton & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2010 2:28:27 PM
Creation date
11/16/2010 2:27:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Aquatic Entertainment Center
Bid No. (xx-xx-xx)
10-10-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />4M INVESTORS, llC <br /> <br />3211 Ponce de Leon Blvd., Suite 301 <br />Coral Gables, FL 33134 <br /> <br />November 8, 20 I 0 <br /> <br />Mr. Rick Conner <br />City Manger <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br /> <br />Dear Rick, <br /> <br />It is with pleasure that 4M Investors, LLC., a recently formed Florida Limited Liability <br />Company and a subsidiary company of J. Milton & Associates hereby provides its Proposal <br />respond and qualifications for the Request for Proposal (RFP) - Issued on October 6. 20 I 0 by the <br />City of Sunny Isles Beach, Florida for the project referenced as: <br /> <br />"DesignlBuild and Upscale Lifestyle Center consisting of a Park, Parking Garage, and an <br />Aquarium and High End Retail Shops" (herein after referred to as the "Project" or the <br />"Aquatic Entertainment Complex") - With subsequent Addendum No. I & 2. <br /> <br />Following the instructions provided at the Mandatory Conference, we have kept our Proposal <br />brief and to the point addressing all of the items and requirements outlined in the above <br />referenced RFP. Our envisioned Project offers the following: <br /> <br />0' An overall Project concept that follows the concept and vision of the City <br />and adheres to the study and recommendations prepared by Luft Consulting, <br />Inc; and Keith & Schnars, P.A. <br /> <br />0' A 1.5 acre "elevated" Park (representing 43% of the Total Site Area) that <br />captures fantastic views and provides multiple benefits and opportunities to <br />the City, its residents and visitors. The Park, other green areas, plazas, <br />loggias, children water court and other hardscape areas represent approx. <br />50% of the Total Site Area. <br /> <br />0' A parking facility that is totally hidden from VIew and closely <br />accommodates City requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.