My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metric Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Metric Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2010 4:33:14 PM
Creation date
11/16/2010 4:09:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Tr ill HCS, Signal97, Synchro, Transit-7F, Netsym, SIDRA, TSIS, Petra, Peek, AAP, CUBE, <br />VOYAGER, CORSIM. <br /> <br />Other Microsoft Office 2007, PowerPoint, Adobe Illustrator CS2, Corel Draw, Corel Photo Paint, <br />Primavera, Adobe Acrobat. <br /> <br />Spel/ill/zed Hardwar - Over 20 Dell Precision T3500, Quad Core Intel@ Xeon@ W3540 2.93GHz, 8M L3, <br />4.8GT/s Turbo / 6GM Memory / 500 GB Hardisk / 768MB Nvidia Quadro FX 1800 Graphics Card / Windows XP 64bit <br />/ 16X DVD+/-RW ROM, 5 color laser printers, 3 color copier, two HP 1050 Color Plotter, laptops, portable <br />video projectors, digital cameras with 7.1 dpi resolution, GPS Survey Equipment and vacuum and radar <br />locators for underground utility location <br /> <br />We are fully capable of providing in-house publishing with our 3 new Ricoh Africio Copiers and <br />specialized software such as ADOBE Photoshop, Acrobat, Framemaker and PageMaker. This helps us <br />prepare brochures, maps, and any other graphics on virtually any type of paper, giving us much more <br />flexibility than if this were outsourced. <br /> <br />Quality Control and As:.,urance <br /> <br />Quality Control Plan A key aspect to any successful project is a successful and well-implemented <br />quality control plan. MEI has developed a quality control approach that can be tailored to the specific <br />needs and requirements of each client. It should be noted that reviews by experienced and independent <br />personnel are built into every Quality Control Plan ensuring that comments are meaningful and <br />constructive. All of our subconsultants are required to submit a Quality Control Plan (QCP) that must be <br />approved by MEl's Project Manager prior to the commencement of the work. <br /> <br />The Quality Control Plan (QCP) for these specific projects will initially be prepared by MEI and submitted <br />to the City's Project Manager within 10 working days of NTP. Within this plan we will identify the <br />independent review team that will be conducting the QC reviews at various stages of the project's life. <br />Once the City's Project Manager approves the QCP, the independent review team will be part of the <br />overall design team. <br /> <br />They will receive copies of all design notes, reports and drawings along with quality control sets of <br />drawings at each phase submittal. <br /> <br />Metric Engineering is committed to supporting the City of Sunny Isles Beach's professional staff in the <br />successful execution and completion of this contract. With this team of quality and seasoned engineers <br />and technicians, managers and state of the art equipment we firmly believe we offer you the best team for <br />this contract. <br /> <br />Fiigure 1 illustrates our Quality Control Process. <br />QUALITY CONTROL PROCESS <br /> <br />_+~ii~,' <br /> <br /> <br />-..-......... -........ <br />.. ;.. . - . .. .. . ~ <br />I . <br />":;-~- f'" " ;',.,' .' ."": .' :... : .. <br /> <br />... . <br />.. . <br />. .. .. . ... <br />. . ~ -. . <br /> <br />~ <br />NOT ;. <br />APPROVED .... . <br /> <br />APPROVED <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.