My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
CPH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 8:47:11 AM
Creation date
11/17/2010 8:46:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br />Galen J. Pugh, ASLA <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Landscape Architect <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />15 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CPH Engineers, Inc./Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Landscape Architecture, Louisiana State University <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Landscape Architect, State of Florida <br />#LA 1522 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. elc) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED <br /> Sanford 151 Streetscape /Gateway Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2007 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Staff Landscape Architect- CPH is currently contracted with the City of Sanford to provide a streetscape design package for a 6 <br /> block section of Historic First Street. The intent of this project is to closely match the streetscape of improvements previously <br /> completed on First Street. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Trail Design - Magnolia Square to Central Winds PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Winter Springs, FL 2005 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cOSI, elc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Staff landscape Architect - This project is a promenade through lush garden spaces including butterfly gardens, palm allees, <br /> perennial gardens, pergolas, classic style pavilions, and fountains. The segment of the trail terminates at the proposed <br /> Veteran's Memorial and Magnolia Square. Future segments will lead to an interactive fountain currently under design by CPH, <br /> an Amphitheatre and the Cross Seminole Trail <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Alabama Avenue PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Deland, Florda 2007 -2008 N/A <br />C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Staff landscape Architect- Trail design and landscape beautification for recreational multipurpose trail along Alabama Avenue <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Base Place Park, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Orange County, Florda 1996-1997 1999-2000 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost, elc) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br /> 4-acre Active Neighborhood Park including recreational trail, soccer field and playground <br /> Project coordinator, facilitated public meetings <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fort Christmas Historical Park, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Orange County, Florida 1996-1998 ongoing <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br /> 24-acre Regional Specialty Park masterplan for the relocation and renovation of historical homes village <br /> Project Coordinator, facilitated public meetings <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.