<br /> (1) TITLE AND LOCATION (Citv and State) 12\ YEAR cnMPLETED
<br /> Little Haiti Cultural Center, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2008 2009
<br />g. (3) BRIEF DESCRIPTION fBrief scooe, size, cost, etc,) AND SPECIFIC ROLE 00 Check if proiect performed with current firm
<br /> Site/civil engineering for a 1.5-acre site development with a cultural center and theater. Paving, grading and stormwater
<br /> management designs were completed and water/sewer services were provided to the site including a water main
<br /> extension. Street imnrovements were desinned alonn with three 13\ narkinn lots total inn 180 snaces.
<br /> (1) TITLE AND LOCATION (Citv and State) '9'
<br /> South Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2009 2009
<br />h. (3) BRIEF DESCRIPTION fBrief scooe, size, cost, etc,) AND SPECIFIC ROLE 00 Check if oroiect oerformed with current firm
<br /> Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and
<br /> landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with
<br /> offices/concession/rest rooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities.
<br /> (1) TITLE AND LOCATION fCitvand State) FTFn
<br /> Stormwater Treatment Distribution Area (STDA), Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Florida 2003 2007
<br />i. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> Civil engineering design for an 88-acre basin pump stormwater runoff for treatment from the Homestead Military base
<br /> utilizing natural wetlands. Design included the pumping station consisting of twin 18,000 GPM pumps, dikes and outfall
<br /> structures with telemetry for remote control of facility and performance monitoring.
<br /> (1) TITLE AND LOCATION (Citv and State) '2' YEAR COMPLETED
<br /> Hadley Park, Miami, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicabfe)
<br /> Ongoing N/A
<br />j. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> Civil engineering design including ground stabilization for fire truck access, stormwater drainage, water and sewer for a
<br /> new park pavilion/amenity building within the City of Miami's Hadley Park.
<br /> (1) TITLE AND LOCATION (Citv and State) 12) YEAR COMPLETED
<br /> Coco cay Site Infrastructure Improvements, Berry Islands, Bahamas PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2002 2002
<br />k. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> Designed site infrastructure and utilities to include fuel handling, R/O water treatment, diesel electrical generation,
<br /> reclaimed water, solid waste incineration and sewage treatment. Designed heavy earthworks including site grading and
<br /> drainage.
<br /> (1) TITLE AND LOCATION (Citv and State) 12'YEARr.nMPLETED
<br /> 360 Condominiums Site Development, North Bay Village, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2008 2008
<br />I. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> Site/Civil engineering design for a 7-acre property development with a total of 378 units, 36 townhouses, and marina.
<br /> Design included paving, grading drainage including over 1,100 LF of exfiltration trench and 5-drainage wells. Design
<br /> also includes water/sewer service for four separate buildings.
<br /> (1) TITLE AND LOCATION (Citv and State) '2' YEAR COMPLETED
<br /> Museum Park, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Ongoing Ongoing
<br />m. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE [R] Check if project performed with current firm
<br /> Civil engineering design and regulatory permitting for the 22-acre site. Design included a stormwater management
<br /> system that combines drainage wells with exfiltration trenches along with retention areas and water and sewer services
<br /> for the Park, which includes Miami-Dade Water and Sewer master agreements for the redeveloped Park.
<br /> (1) TITLE AND LOCATION (Citv and State) '2\ YEAR COMPLETED
<br /> Bluepoints Marina at Port Canaveral, Brevard County, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable)
<br /> Ongoing 2010 (Est.)
<br />n. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE 00 Check if project performed with current firm
<br /> Civil engineering design included site planning, a stormwater management system, wet detention pond, paving, grading
<br /> and drainage, water/sewer services as well as new utilities and fire protection.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|