Laserfiche WebLink
<br />12, NAME <br />Sandra Rahman <br /> <br /> <br />15, FIRM NAME AND LOCATION ICitv and Statel <br />~,~':,'~,~' Coastal Systems International <br />...: ,c Coral Gables, Florida <br />SYITllI1 <br /> <br />16, EDUCATION (DEGREE AND SPECIALlZA nON) <br />Data Processing and Management <br />Geographic Information Systems <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION ISTATE AND DISCIPLINE) <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS IPublications. Oroanizations. Trainino. Awards. etc.! <br />Ms. Rahman is responsible for processing all field data collected by Coastal Systems for use in analysis, monitoring, and design, She regularly <br />utilizes Digital Terrain Modeling (DTM) software to generate contour maps and calculate cut/fill volumes for a variety of coastal and dredging <br />projects. She is also responsible for providing deliverables in GIS formats, as well as providing full GIS capabilities for the firm with ESRI <br />software. <br /> <br />r ml- '-I:lelll::lMII.."'1I ] <br /> (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED <br /> Boca Inlet, Palm Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> 2004 N/A <br />a. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE !Rl Check if project performed with current firm <br /> Analyzed 20 years of data to evaluate performance of the inlet and adjacent beaches with respect to sediment transport <br /> within the region. Utilized spatial analysis and GIS to recreate historical sediment budget to account for ebb shoal and <br /> maintenance dredging. <br /> (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED <br /> Rickenbacker Causeway Recreation Area, Miami - Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida Ongoing 2010 (Est.) <br /> (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE !Rl Check if project performed with current firm <br />b. Design of shoreline stabilization and associated public recreation area improvements along 2.5-miles of shoreline of the <br />Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed, and coastal <br /> engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline <br /> stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, <br /> parking improvements, stormwater management and vendor kiosks for waterfront activities. <br /> (1) TITLE AND LOCATION ICitv and Statel /2\ YEAR COMPLETED <br /> Hillsboro Inlet Channel Improvements, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing 2002 <br />c. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc,) AND SPECIFIC ROLE !Rl Check if project performed with current firm <br /> Coastal engineering and environmental permitting for 165,000 cubic yard inlet-dredging project to improve coastal <br /> sediment sand bypassing and navigation. Hydrographic and marine resource surveys conducted. <br /> (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED <br /> Rybovich Spencer Boatyard, West Palm Beach, Florida PROFESSIONAL SERVICES 1CONSTRUCTION (If applicable) <br /> 2008 2008 <br />d. (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.! AND SPECIFIC ROLE !Rl Check if proiect performed with current firm <br />Design of dredging and bulkhead for 150-slip marina redevelopment to accommodate vessels up to 250 feet long. <br /> Design of 100,000 cubic yards of dredging and 3,000 feet of bulkhead along with travel lift piers to accommodate 660-ton <br /> lift. Coastal engineering analysis for floating structure design. <br /> (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED <br /> Miami-Dade County Morphological Change Study, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida 2006 N/A <br /> (3) BRIEF DESCRIPTION IBrief scope. size. cost, etc.! AND SPECIFIC ROLE !Rl Check if project performed with current firm <br />e. Study of volumetric and morphological changes between Bakers Haulover Inlet and Government Cut with detailed <br /> analysis on the performance of the 32nd Street Breakwater Project. Establishment of regional GIS database for beach <br /> management and update of regional sediment budget with survey data between 1980 and 2004. Prepared <br /> recommendations for further hot-spot stabilization and backpassing beach management County-wide. <br /> (1) TITLE AND LOCATION ICitv and State) /2\ YEAR COMPLETED <br /> Peanut Island Environmental Restoration, Palm Beach County, Florida PROFESSIONAL SERVICES-j CONSTRUCTION (If applicable) <br /> 2003 2005 <br /> (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE !Rl Check if proiect performed with current firm <br /> Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3-acre shallow seagrass lagoon. <br />f. Additional features include a tidal pond and flushing channel, shallow-draft marina with floating docks, pedestrian <br />boardwalks and site utility upgrades. <br />