Laserfiche WebLink
<br /> <br />SRS Experience <br /> <br /> <br />DESIGN EXPERIENCE WITH WATER SUPPLY AND WASTEWATER <br />SYSTEMS <br /> <br />Master plans of water and sanitary sewer systems, hydraulic network <br />analysis by computer, sanitary sewer collection and transmission <br />systems including forces mains and gravity systems, water distribution <br />and transmission systems, pump stations, wells, water treatment plants <br />and special structures, <br /> <br /> <br />Hialeah Annex Water and Sewer Systems and Master Plan - This <br />work included the preparation of a water and sewer master plan for the <br />area in order to determine the current and future service needs and the <br />size and location/alignment of water and sewer main Jines needed <br />along the major arterial roadways. It also included the design of an <br />8.06 MGD regional sewer pump station with backup generator with t.. - ..:I <br />sufficient capacity to serve the entire annexed and adjacent areas. <br />Additional work included the design of approximately 1,480 LF of 24-inch gravity sanitary sewer mains, <br />approximately 10,724 LF of 24-inch force main extensions, approximately 3,229 LF of 36-inch force main <br />extensions, and approximately 12,166 LF of 36-inch water main extensions, <br /> <br /> <br />~ <br />r, <br /> <br />EXPERIENCE PROVIDING CONSTRUCTION MANAGEMENT AND <br />SUPPORT SERVICES <br /> <br />In addition to our firm's vast experience designing local roadway and <br />site/land improvement projects, our firm also specializes in providing municipalities with construction <br />administration support services and construction engineering inspection (CEI) services. Our most recent <br />relevant experience includes several roadway and drainage improvement projects/contracts for Miami-Dade <br />County Public Works, DERM, City of Miami, City of Hialeah, and as Construction Consultants to the Naranja <br />Lakes CRA. Among these projects were the NW 3rd Street and SW 69th Street Storm Sewer Projects for the <br />City of Miami Office of Capital Improvements which had a combined construction cost of $2.3 million in roadway <br />restorations, Pinehurst Storm Sewer Retrofitting Project which included roadway restoration and drainage <br />improvements with a construction cost of $1,6 million and <br />Avalon Storm Sewer Project which includes both roadway <br />restoration and drainage improvements and has an estimated <br />construction cost of over $3 million. Recently, our has been <br />contracted to provide CEI services to several FDOT ARRA <br />(LAP) projects for the City of Hialeah and Coral Gables, <br /> <br />!i <br /> <br />7'~:'!1 <br /> <br />/' <br />/' <br /> <br /> <br />! <br /> <br /> <br /> <br />\v <br />'i <br /> <br />r ~.,Jj ,}., /}~ ~ <br />,'~1 1'_ <br /> <br />. AUG' {"2005 <br /> <br />~-i' <br /> <br />