<br />workshops to collect public pinions and suggestions, and ensured the Master Plan was reflective of, and sensitive to the
<br />community.
<br />· South Miami Downtown Improvements, Phases I, II & III, South Miami, Florida - Principal in Charge for these improvements within
<br />the South Miami Downtown area. The first phase of improvements consisted of the design, permitting, and construction of
<br />streetscape improvements on SW 73rd St., SW 58th Ave., and SW 58th Ct. The Improvements included approximately 1100
<br />linear feet of 12" DIP watermain extension and new drainage systems. These updated systems were vital to allow the downtown
<br />area to develop and expand. The second phase of work consisted of the design, permitting, and construction of complete
<br />streetscape improvements on SW 58th Ave. and on SW 73rd St. between SW 58th Ave. and SW 57th Ct. The project extended
<br />three blocks and included new wide pedestrian friendly sidewalks, irrigation, lighting, landscaping, 210 linear feet of 12" DIP
<br />watermain, and new drainage systems. The third phase of work consisted of the design, permitting, construction of sidewalk,
<br />drainage and watermain improvements on SW 74th St. between SW 59th Ct. and SW 57th Ct. and SW 73rd St. between SW 59th
<br />Ct. and SW 58th Ct.
<br />· Crandon Boulevard Master Plan, Key Biscayne, Florida - Principal in Charge of design for this project that takes an existing
<br />suburban style highway and transforms it into a center of community activities. By promoting the safe and secure transit of all
<br />types of vehicles and pedestrians, this CPTED-friendly design also serves to create a source of identity for the community
<br />connecting retail, residential, public parks and government facilities into a cohesive design. The project consisted of a master plan
<br />that encompassed the design for a 4-lane divided road, improved public safety, easing of traffic congestion, traffic calming,
<br />pedestrianization, improved mass transit, streetscape improvements, sidewalks, lighting, and a roundabout.
<br />· Plantation Midtown Improvements Phase I, Plantation, Florida - Principal in Charge for streetscape design that will include the
<br />reconstruction of 2.5 miles of mixed use walkways, textured crosswalks, parallel parking, landscaped medians, and a roundabout
<br />at a key intersection of the City. As the first phase of a large project, C3TS' design will be the template for all improvements to
<br />follow in the City's midtown area.
<br />· Highland Village Neighborhood Improvements, North Miami Beach, Florida - A $6 million dollar neighborhood improvement project
<br />in a low lying area of the City of North Miami Beach with extensive flooding and water quality problems resulting from failed onsite
<br />septic systems. The project included design of a pumped deep well disposal system, design of a wastewater collection and
<br />transmission system, including a new pump station and force main, design of roadway and site improvements.
<br />
<br />Alternate Contact: Daniel Grandal, P.E., CFM, LEED AP / Project Manager
<br />C3TS
<br />901 Ponce de Leon Blvd, Suite 900
<br />Coral Gables, Florida 33134
<br />Tel 305-445-2900 Fax 3005-445-3366
<br />dgrandal@c3ts.com
<br />
<br />Mr. Grandal has over 17 years experience in design and construction of civil engineering and site development projects. He has served
<br />as a project manager and project engineer for various drainage, water and sewer projects. He was a plan reviewer for Miami-Dade
<br />DERM. He has a broad understanding of permitting requirements of Miami-Dade County Department of Public Works (DPW),
<br />Department of Environmental Resources Management (DERM), SFWMD, and FDEP. His drainage experience has included
<br />Environmental Resource Permitting (ERP), multi-basin fioodplan analysis, cut and fill analysis and wetland mitigation. He is proficient at
<br />various software packages including ICPR, MBR (SFWMD Multi-Basin Routing Software), Flowmaster, AutoCAD, AutoTurn and
<br />EaglePoint. Some of his experience includes:
<br />
<br />· Belle Meade Drainage Improvements, Miami, Florida - Project Manager of this $8 million project which consisted of the design and
<br />permitting of a drainage and streetscape improvement project encompassing several miles of road in a developed flood-prone
<br />neighborhood providing quality treatment through the use of exfiltration trenches and storm water treatment units and discharging
<br />through a large stormwater pump station to the Little River Canal. Permitting included pre/post computer modeling and stage
<br />calculation for Miami-Dade's Class II Surface Water Management Permit.
<br />· Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Project Manager for the design of over 27 miles of
<br />watermain to complete the potable water system of the entire Village. The Master Plan was prepared that included a
<br />computerized model of the entire system and public workshops and meetings were held to inform and educate the residents of the
<br />work and cost involved in the project. C3TS also prepared special taxing districts and an EQCB Variance to detail the finances of
<br />this $23 million project.
<br />
<br />professional ENGINEERING services ~=
<br />RFQ No.1 0-04-01 ~lm:I
<br />
|