Laserfiche WebLink
<br />workshops to collect public pinions and suggestions, and ensured the Master Plan was reflective of, and sensitive to the <br />community. <br />· South Miami Downtown Improvements, Phases I, II & III, South Miami, Florida - Principal in Charge for these improvements within <br />the South Miami Downtown area. The first phase of improvements consisted of the design, permitting, and construction of <br />streetscape improvements on SW 73rd St., SW 58th Ave., and SW 58th Ct. The Improvements included approximately 1100 <br />linear feet of 12" DIP watermain extension and new drainage systems. These updated systems were vital to allow the downtown <br />area to develop and expand. The second phase of work consisted of the design, permitting, and construction of complete <br />streetscape improvements on SW 58th Ave. and on SW 73rd St. between SW 58th Ave. and SW 57th Ct. The project extended <br />three blocks and included new wide pedestrian friendly sidewalks, irrigation, lighting, landscaping, 210 linear feet of 12" DIP <br />watermain, and new drainage systems. The third phase of work consisted of the design, permitting, construction of sidewalk, <br />drainage and watermain improvements on SW 74th St. between SW 59th Ct. and SW 57th Ct. and SW 73rd St. between SW 59th <br />Ct. and SW 58th Ct. <br />· Crandon Boulevard Master Plan, Key Biscayne, Florida - Principal in Charge of design for this project that takes an existing <br />suburban style highway and transforms it into a center of community activities. By promoting the safe and secure transit of all <br />types of vehicles and pedestrians, this CPTED-friendly design also serves to create a source of identity for the community <br />connecting retail, residential, public parks and government facilities into a cohesive design. The project consisted of a master plan <br />that encompassed the design for a 4-lane divided road, improved public safety, easing of traffic congestion, traffic calming, <br />pedestrianization, improved mass transit, streetscape improvements, sidewalks, lighting, and a roundabout. <br />· Plantation Midtown Improvements Phase I, Plantation, Florida - Principal in Charge for streetscape design that will include the <br />reconstruction of 2.5 miles of mixed use walkways, textured crosswalks, parallel parking, landscaped medians, and a roundabout <br />at a key intersection of the City. As the first phase of a large project, C3TS' design will be the template for all improvements to <br />follow in the City's midtown area. <br />· Highland Village Neighborhood Improvements, North Miami Beach, Florida - A $6 million dollar neighborhood improvement project <br />in a low lying area of the City of North Miami Beach with extensive flooding and water quality problems resulting from failed onsite <br />septic systems. The project included design of a pumped deep well disposal system, design of a wastewater collection and <br />transmission system, including a new pump station and force main, design of roadway and site improvements. <br /> <br />Alternate Contact: Daniel Grandal, P.E., CFM, LEED AP / Project Manager <br />C3TS <br />901 Ponce de Leon Blvd, Suite 900 <br />Coral Gables, Florida 33134 <br />Tel 305-445-2900 Fax 3005-445-3366 <br />dgrandal@c3ts.com <br /> <br />Mr. Grandal has over 17 years experience in design and construction of civil engineering and site development projects. He has served <br />as a project manager and project engineer for various drainage, water and sewer projects. He was a plan reviewer for Miami-Dade <br />DERM. He has a broad understanding of permitting requirements of Miami-Dade County Department of Public Works (DPW), <br />Department of Environmental Resources Management (DERM), SFWMD, and FDEP. His drainage experience has included <br />Environmental Resource Permitting (ERP), multi-basin fioodplan analysis, cut and fill analysis and wetland mitigation. He is proficient at <br />various software packages including ICPR, MBR (SFWMD Multi-Basin Routing Software), Flowmaster, AutoCAD, AutoTurn and <br />EaglePoint. Some of his experience includes: <br /> <br />· Belle Meade Drainage Improvements, Miami, Florida - Project Manager of this $8 million project which consisted of the design and <br />permitting of a drainage and streetscape improvement project encompassing several miles of road in a developed flood-prone <br />neighborhood providing quality treatment through the use of exfiltration trenches and storm water treatment units and discharging <br />through a large stormwater pump station to the Little River Canal. Permitting included pre/post computer modeling and stage <br />calculation for Miami-Dade's Class II Surface Water Management Permit. <br />· Pinecrest Watermain Master Plan and System Design, Pinecrest, Florida - Project Manager for the design of over 27 miles of <br />watermain to complete the potable water system of the entire Village. The Master Plan was prepared that included a <br />computerized model of the entire system and public workshops and meetings were held to inform and educate the residents of the <br />work and cost involved in the project. C3TS also prepared special taxing districts and an EQCB Variance to detail the finances of <br />this $23 million project. <br /> <br />professional ENGINEERING services ~= <br />RFQ No.1 0-04-01 ~lm:I <br />