Laserfiche WebLink
<br />e <br /> <br />-' <br />.. <br />(f) <br />a <br />a. <br />a <br />'" <br />a. <br />(f) <br />I <br />f- <br />... <br />a <br />UJ <br />'" <br />.. <br />a. <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />a <br />z <br />a <br />>= <br />u <br />ii: <br />f- <br />(f) <br />UJ <br />'" <br />UJ <br />I <br />f- <br />a <br />f- <br /> <br />ei <br />(f) <br />~ <br />f- <br />UJ <br />UJ <br />I <br />(f) <br />(f) <br />I <br />f- <br />Z <br />a <br />o <br />UJ <br />z <br />;;' <br />f- <br />Z <br />a <br />u <br />.. <br />f- <br />.. <br />o <br />... <br />a <br />UJ <br />'" <br />::> <br />(f) <br />g <br />u <br />(f) <br />is <br />'" <br />a <br />UJ <br />(f) <br />::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />associated engineering services scopes of work for <br />performing subsurface im"estigations required to <br />document existing conditions for preparation of the <br />Ccrtificate of Nced and for gcotcchnical cffort <br />associated with licensing and design of thc foundations <br />of thc proposed [ndcpcndent Spent Fuel Storage <br />Installation (ISFSI) and to comply with US Nuclear <br />Regulatory recjuirements. Re\"iewed design calculations <br />for the stability, licjuefaction of the site and the <br />preparation of gcotechnical criteria, and the geotechnical <br />report. <br /> <br />Geotechnical Consultant, Independent Spent Fue <br />Storage installation, 58209, Fort Calhoun Station, <br />Omaha, NE, OS/2003 - 07/2004. As Geotcchnical <br />Consultant, re\.iewed thc dcsign calculations for seismic <br />stability and lic!uefaction of the site of the [ndcpendent <br />Fuel Storage Installation. Also re\"iewed the preparation <br />of geotechnical dcsign criteria and geotechnical report. <br /> <br />Geotechnical Consultant, Independent Spent Fuel <br />Storage Installation, Duane Arnold Energy Center, <br />Palo, lA, OS/2002 - 09/2002. ,\s Geotechnical <br />Consultant, performed technical revic\v for \"arious <br />methods of site im"estigation, formulated static and <br />d~'namic laboratory soil testing program, interpreted soil <br />strength and compressibility parameters for bearing <br />capacity and scttlement calculations, preparcd the <br />Laboratory Testing Section for the Geotechnical Report <br />for the Independent Fuel Storage Installation. <br /> <br />Geotechnical Consultant, Private Fuel Storage <br />Facility - Skull Valley, UT, Private Fuel Storage, <br />L.L.c., Skull Valley, UT, OS/2002 - 06/2002. As <br />Geotechnical Consultant, performcd tcchnical review for <br />various methods of site investigation, formulated static <br />and dynamic laboratory soil testing program, interpreted <br />soil strength and compressibility parameters for bearing <br />capacity and settlemcnt calculations. Provided technical <br />input and re\"iew for the responscs to NRC and State of <br />Utah inc]uiry cjuestions generated for pre-public hearing <br />of the licensing of the facility. Performed technical <br />reviews of the geotechnical design criteria and soil <br />structurc interaction calculations. <br /> <br />Geotechnical Consultant, Marcus Hook <br />Cogeneration Plant, PG&E National Energy Group, <br />Marcus Hook, NJ, OS/2002 - 06/2002. As <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />06C'22006T <br /> <br />Geotechnical Consultant, performed adequacy review <br />for stability analysis of the perimeter slope at the site of <br />combined cycle power plant and re\"iewed the shear <br />strength parameters used for the stability analysis. <br />Provide the method for slope stability analysis using the <br />anchor pilcs to stabilizing the slope with marginal factor <br />of safety. <br /> <br />Geotechnical Consultant, Covert Generating <br />Project, PG&E National Energy Group, Covert, <br />Michigan, OS/2002 - 06/2002. As Geotechnical <br />Consultant, performed adecjuacy review for pile <br />foundation design, formulated pile load test program, <br />interprcted pile design capacity for the foundation design <br />of the main structures. Performed engineering <br />e\"aluations to calculate the axial and horizontal spring <br />constants and damping ratios for use in the dynamic <br />analyses of thc Gas Turbine/ Generator. <br /> <br />Geotechnical Consultant, Mixed Oxide (MOx) Fuel <br />Fabrication Facility, US Department of Energy - <br />Chicago Operations Office, Aiken, SC, 10/2001- <br />04/2002. As Geotechnical Consultant, prm"ide <br />technical consultatioll and re\"iew of \"arious geotcchnical <br />analyses \\'hich including scismic site responsc analysis, <br />liquefaction analysis, slope stability analysis and <br />settlement analysis. Prcwided critical re\.iews and <br />comments for the Site Geotechnical Report to ensurc its <br />technical adecluacy for NRC permit licensing application. <br /> <br />Geotechnical Consultant, Independent Spent Fuel <br />Storage Installation, Duane Arnold Energy Center, <br />Palo, lA, 03/2001- 04/2002. As Geotechnical <br />Consultant, pcrformed technical rcvicw for \"arious <br />mcthods of sitc im"cstigation, formulated static and <br />dynamic laboratory soil tcsting program, interpreted soil <br />strength and compressibility parameters for bearing <br />capacity and settlement calculations, prepared the <br />Laboratory Testing Section for the Gcotcchnical Report <br />for the Independent Fuel Storage Installation. <br /> <br />Geotechnical Consultant, Covert Generating <br />Project, PG&E National Energy Group, Covert, MI, <br />03/2001- 04/2002. As Geotechnical Consultant, <br />performed adecluacy review for pile foundation design, <br />formulated pilc load tcst program, interprctcd pilc dcsign <br />capacity for the foundation design of the main <br />structures. Performed engineering evaluations to <br /> <br />THOMAS Y. CHANG [2] <br />