Laserfiche WebLink
<br />. <br /> <br />..i <br /><( <br />(/) <br />o <br />"- <br />o <br /><t: <br />"- <br />(/) <br />I <br />I- <br />"- <br />o <br />w <br />" <br /><( <br />"- <br />W <br />..J <br />l- <br />e: <br />W <br />I <br />I- <br />Z <br />o <br />Z <br />o <br />e: <br />u <br />ii' <br />l- <br />(/) <br />W <br /><t: <br />W <br />I <br />I- <br />o <br />I- <br />.~ <br />(/) <br />'!l <br />I- <br />W <br />W <br />I <br />(/) <br />(/) <br />I <br />I- <br />Z <br />o <br />o <br />w <br />z <br />;;' <br />I- <br />Z <br />o <br />u <br /><( <br />I- <br /><( <br />o <br />"- <br />o <br />W <br /><t: <br />=' <br />(/) <br />g <br />u <br />(/) <br />Ci <br /><t: <br />o <br />w <br />(/) <br />=' <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />\'ears after it was filled. The task was to e,'aluate the <br />potential for additional settlement and for any damage to <br />the tank, which is supported on a concrete mat. <br /> <br />Accomplishments: <br />Rc,'iewed a,'ailablc subsurfacc information and <br />settlemcnt data for the tank. Performed analysis to <br />estimate settlemcnt 20 years after the tank was filled. <br />Concluded that settlement across the mat would vary <br />approximately uniformly, and that the mild slopc of the <br />mat would not impair the functionality or thc structural <br />integrity of the tank. <br /> <br />Civil Engineer, Detailed Plan of Study for the Study <br />of Alternatives to the Panama Canal, Commission <br />for the Study of Alternatives to the Panama Canal, <br />Panama, 01/1990 - 06/1990. Stonc & \'('ebster was a <br />mcmber of a consortium prcparing a Detailed Plan of <br />Stud:' of i\ltcrnatives to the Panama Canal, for a tri- <br />national Study Commission. <br /> <br />;\ccomplishmcnts: <br />Prepared sections of thc study plan dcaling with <br />Engineering and Cost Estimates. Reviewed summary <br />dcscriptions of canal and noncanal alternatives, ,'isited <br />thc canal, dcscribcd how cngineering fcasibility would be <br />e,'aluated by the Consortium during prescrcening of <br />alternatives, and preparcd a Terms of Reference (scopc <br />of work) for studics by an Engincering and Cost <br />component contractor to evaluate the technical <br />fcasibility and cost of alternati,'cs which sUlTi,'c <br />prescreenmg. <br /> <br />Site Manager, Site Assessment for Sludge <br />Dewatering Project, New York City Department of <br />Environmental Protection, Jamaica, NY, 05/1989- <br />04/1990. Study to determine whether hazardous <br />materials were present at the location of proposed sludge <br />dewatering facilities at the Jamaica \'(rater Pollution <br />Control Plant. <br /> <br />Accomplishments: <br />Had O\'erall responsibility for site ill\'estigations that <br />included soil gas sampling, borings, installation of <br />groundwater monitoring wells, sampling of used drum <br />contents and chemical analysis of soil, groundwater and <br />drum contents. Prepared portions of interim report and <br /> <br />draft final report presenting the results of the site <br />assessment. <br /> <br />Project Manager, South Boston Piers Transitway <br />Project, Massachusetts Bay Transportation <br />Authority, Boston, MA, 01/1995 - 10/1998. Design of <br />systemwide elements for a project to provide <br />underground electric or dual-mode bus selTice from <br />South Station in downtown Boston to the South Boston <br />Piers area. <br /> <br />Accomplishments: <br />Directed a team of eight subconsultants. The work <br />accomplished included: GO perccnt design for emergency <br />tunnel ventilation; 90 percent design of communications, <br />tunncllighting, and emergency fan controls; 90 pcrccnt <br />design of traction power and catenary for the <br />undcrground route; 30 perccnt dcsign of the 'Thiclc <br />maintcnancc facility; 30 pcrcent design of an <br />undcrground station and section of line tunnel; <br />c,'aluation of an alternati,'C tunnel route for a Phasc 2 <br />cxtension of the Transitway to mid-town, and <br />gcotechnical and em'ironmental im'estigations. <br /> <br />Assistant Project Engineer, South Boston Piers <br />Transitway Project, Massachusetts Bay <br />Transportation Authority, Boston, MA, 04/1998 - <br />07/2000. Site feasibility study and conceptual design of <br />a maintenance facility at Southampton Street. <br /> <br />Accomplishmcnts: <br />\X'ith the project Industrial Engineer, met with Client's <br />t\Ianager of Bus Operations to discuss criteria for the <br />maintcnance facility, including required functions, space <br />requirements, and sitc access. Re,'iewed alternative site <br />layouts and drafts of thc fcasibility and conceptual <br />design reports. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />4 <br /> <br />WILLIAM O. MARTIN <br /> <br />06C'22006T <br />