Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />Steven Guthrie. UBCI <br /> <br />13. ROLE IN THIS CONTRACT <br />Construction Administrator <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br /> <br />27 <br /> <br />2 <br /> <br />1S. FIRM NAME AND LOCATION (Oty.ndState) <br />Zyscovich, Inc.. 100 N. Biscayne Boulevard, 27th Floor Miami, FL 33132 <br />16. EDUCATION (DEGREE AND SPEClALlZA TfON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Flushing High School, Queens, NY <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PubJ;c.t;ons. O'g.n;"';o05. r..;n;ng.Aw..ds. etc.) <br />UBCI <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (Oty.ndS"'e) <br />CORAL SPRINGS SPORTSPLEX <br />Coral Springs. FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If App/;c.b/e) <br />2001 2004 <br /> <br />a. <br /> <br />(3) BRIEF DESCRIPTION (B,;ef scope. s;ze. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />Project includes a 7.S00 SF concession/storage & administrative building to hold sporting and community events with competitive baseball. softball. <br />football and soccer fields accommodating the adjacent Coral Glades High School Track. tennis and basketball courts. A "tot-lot" with shade structures <br />and numerous picnic facilities are also provided in the park. <br />Cost: 9.8 M <br />(1) TITLE AND LOCATION (Oty .nd State) <br />COOPER CITY MUNICIPAL & PUBLIC SAFETY COMPLEX <br />Cooper City, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If App/;c.b/e) <br />2005 Pending <br /> <br />b. <br /> <br />(3) BRIEF DESCRIPTION (B,;ef scope. s;ze. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> <br />This project involved a facility study and program analysis. The city hall houses the offices of the City Commission. Mayor. City Manager. City <br />Attorney. City Clerk Finance department. Building department. and Growth Management department. as well as a Commission meeting/multi-purpose <br />room. A new fire station is also housed on the site. Cost $11 M <br /> <br /> <br />(1) TITLE AND LOCATION (Oty .nd State) <br />500 BLOCK OF COLLINS AVENUE <br />Miami Beach. FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If Applkable) <br />2004 2005 <br /> <br />C. (3) BRIEF DESCRIPTION (B,;ef scope. s;ze. cost. ete) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> <br />Ensemble of one and two floor townhouse style retail boutiques with a three-level parking garage. Architecture is amplified by an <br />origami-like metal screen that wraps around the building at the corner, which conceals the parking garage from view. <br />Cost: $ 9.7 M <br /> <br />(1) TITLE AND LOCATION (Oty.ndState) <br />WESTERN HIGH SCHOOL CLASSROOM ADDITION <br />Davie, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If App/;c.b/e) <br />2005 2007 <br /> <br />d. (3) BRIEF DESCRIPTION (B,;ef scope, s;ze. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> <br />The design approach to the 24-c1assroom addition and locker room expansion at Western High School creates a new campus focus, a <br />renewed sense of spirit for the school, and organization in the site. <br />Cost $6.5M <br /> <br />(1) TITLE AND LOCATION (Oty.ndState) <br />CORAL SPRINGS HIGH SCHOOL CLASSROOM ADDITION <br /> <br />Coral Springs. FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If App/;cab/e) <br />2005 2006 <br /> <br />e. <br /> <br />(3) BRIEF DESCRIPTION (B,;ef scope. s;ze. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />Zyscovich. Inc. designed a 24-c1assroom addition which will propel the aging high school into the future by providing a new state-of-the- <br />art science educational facility of roughly 46.890 SF. This project will alleviate some of the overcrowding and class size reduction issues <br />the current school is facing. A prototype-design classroom building was implemented in an effort to minimize the design phases and to <br />expedite the production of this project. Cost $8M <br /> <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />