Laserfiche WebLink
<br />12. NAME <br />driana Jaegerman, EI <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Project Engineer a. TOTAL b. WITH CURRENT FIRM <br /> <br />2 <br /> <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Bliss & N itra , Inc. - Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />BSCE, University of Miami, 2005 <br />Structural Engineering <br /> <br />BSAE, University of Miami, 2005 <br />Architectural Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Member of American Institute of Steel Construction; and American Society of Civil Engineers <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> State School BB-1 PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Sunny Isles Beach, Florida 2005 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />This project is a new 150,000 SF, 1,642 student station for Pre-K through 8th grade. The school includes a four-story <br /> classroom building and two-story administration, media center and cafeteria/auditorium and three level, 137 -car garage <br /> on a landmark site. <br /> Construction Cost $35 Million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Oceanside Plaza Garage PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Pompano Beach, Florida 2004 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br /> This project is a mixed-use with 186 residential units in a 17-story building. The three level parking structure for 500- <br /> cars is located behind the building. <br /> Garage Construction Cost NA. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> State School WWW PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Hialeah, Florida 2006 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />c. This project a new four building, 2,000 student station high school. The school consists of four-story classrooms <br /> building, two-story parking structure with gymnasium on roof; auditorium and music/art building. <br /> Construction Cost $51 Million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Causeway Square PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> North Miami, Florida 2006 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />d. This project is a mixed-use building containing L.A. Fitness facility over retail stores totaling 67,015 SF and a three level, <br /> 256-car garage. On the west side is a 5,500 SF one-story restaurant and on the east side is a 5,000 SF one-story bank <br /> building. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Orange Bowl Repairs and Remediation PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) <br /> Miami, Florida 1997 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />e. City of Miami has BNI on continual contract for repairs. <br /> Construction Cost NA <br /> <br />. <br /> <br />ST ANDARD FORM 330 (62004) PAGE 2 <br />