My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:35:10 PM
Creation date
11/29/2010 3:34:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Jennifer McConney <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Project Architect <br /> <br />10 9 <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b WITH CURRENT FIRM <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Kobi Kar Architecture and Interior Desi n, Inc. <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Bachelor of Architecture, University of Miami <br /> <br />Registered Architect. State of Florida <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Traming, Awards, etc) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If Appticable) <br /> The Caribbean Condominium 2006 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X ] Check if project performed with current firm <br /> Project Manager and designer of 19 story condominium and Historic renovation project <br /> that consists of 200,000 sq.ft. and a basement Garage structure on the Ocean. Cost of <br /> oroiect is 60 Million and will be com Dieted in 2008 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Capri South Beach Condominium PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2006 2008 <br />b. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project Architect and Designer of a 3 building complex which included a basement <br /> garage, 14 story tower, historic building and a 6 story mid rise. Project cost is 70 Million <br /> and 114 000 sa.ft. <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Nobe Parking Garage and Retail PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2006 2008 <br />c. (3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Five story Parking structure with a retail component in Miami Beach. Project cost is 5 <br /> million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Maclee Headquarters PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2001 2002 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project Manager and Project designer of a 5 story office and retail building with a 3 <br /> story parking structure. The project consists of approximately 45,000 sq.ft. and cost was <br /> 10 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Beach Police Athletic League PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2000 2000 <br />e. (3) BRIEF DESCRIPTION (Briefscope. size. cost, etc) AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Project Manager and Designer of the new construction and renovation of Miami <br /> Beach public building. The approximate sq.ft. is 40,000 and cost was 3 million. <br />
The URL can be used to link to this page
Your browser does not support the video tag.