<br />12, NAME
<br />Jerome Curley, PE
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />Quality Control a. TOTAL
<br />61.7
<br />
<br />14, YEARS EXPERIENCE
<br />1 b, WITH CURRENT FIRM
<br />11.7
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Architects International, Inc., 227 NE 26 Terrace, Miami, FL 33137
<br />
<br />16, EDUCATION (DEGREE AND SPECIALlZA nON)
<br />Bachelor of Mechanical Engineering
<br />New York University - 1947
<br />
<br />17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />Florida State Professional Engineering #5374
<br />Florida State Certified General Contractor #CGC 007772
<br />Florida State Certified Mechanical Contractor #CMC
<br />025354
<br />UBCI-Uniform Building Code Inspector
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida International University Graham Center Addition PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> Miami, Florida 2004 2004
<br />a, (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc) AND SPECIFIC ROLE ~ Check if project pertormed with current tirm
<br />Building addition consisting of 36,000 SF of expansion areas in two stories to house the Graham Center, Administration,
<br /> campus life, retailers and vendors. This addition is construction along the North side of the existing Graham Center
<br /> Building. Inspection Services Provided. Head of Construction Management
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida International University Marine Biology Building PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> Miami, Florida 2005 2005
<br />b, (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE ~ Check it project pertormed with current firm
<br />A four level structure with tilt-up exterior wall panels with rooms for Marine biology laboratories including extensive salt
<br /> water piping. Inspection Services Provided. Head of Construction Management
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida International University Parking Garage #3 PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> Miami, Florida 2004 2004
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i.{J Check if project pertormed with current firm
<br />C, A six level post tensioned structure with 1,448 parking spaces, architectural pre-cast exterior and detailed with decorative
<br /> iron grille work and spandrel glass. Inspection Services Provided. Head of Construction Management
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida International University Recreation Center PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> Miami, Florida 2004 2004
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc) AND SPECIFIC ROLE ~ Check jf project performed with current firm
<br />d, A 2-story, 50,765 SF, 4 court gymnasium, food service court and dining areas, fitness center, gathering rooms,
<br /> conference areas and offices. Inspection Services Provided, Head of Construction Management
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida International University Wellness Center Addition PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> Miami, Florida 2004 2004
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i.{J Check if project pertormed with current firm
<br />e. Building addition consisting of 12,512 SF of expansion areas in two stories with administration, examination rooms,
<br /> pharmacy, doctor's office, pathology laboratory and medical library. Inspection Services Provided, Head of Construction
<br /> Management
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 4
<br />
|