Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME 13. ROLE IN THIS CONTRACT <br />William Travis Quality Assurance/Quality Control <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />URS Corporation, Boca Raton, FL <br /> <br />YEARS EXPERIENCE <br />a TOTAL: 30 b, CURRENT FIRM: 2 <br /> <br />16. EDUCATION (Degree and Specialization) <br />BS Mech. Eng. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certified Lead Assessor, BSI; Sr. Member ASQ <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Palm Beach County Fire Training Facility and <br />Administration Complex, Palm Beach County, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE [8J Check if project performed with current firm <br />Role. URS is the site civil consultant for the fire training facility (FTF). This project covers 42:f: acres on the old Cross <br />State Landfill site, On the lower at grade level of the site there are two (2) major buildings, Administration Building and the <br />Apparatus Building, On top of the existing landfill (closed in the 1970's) are the majority of the fire training props. Site civil <br />design included paving, grading and drainage, water, sewer, fire lines, including 3 on-site sanitary lift stations and a sanitary <br />a. force main connecting to an existing off-site force main, Issues of concern during the storm water drainage design included <br />adequate storage of the existing lake (requiring expansion for ultimate buildout of the FTF and other tenant uses, Portions of <br />the site fall within the C-51 Flood Basin and required compensatory storage provisions due to the proposed filling of the C- <br />51 Basin flood plain for the construction of building pads and parking lots at the southeast portion of the site, <br /> <br />Cost: $2,000,000 <br /> <br />Mr. Travis' role was to develop and implement project quality processes for this project, and monitor the project to ensure all <br />processes are adhered to, and are effective, <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Borland Center <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br /> <br />[8J Check if project performed with current firm <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE <br /> <br />The Borland Center is a 47-acre mixed-use land development project within the Northern Palm Beach County Improvement <br />District (NPBCID) in Palm Beach Gardens. The developer RAM Development Company, is building this mixed use <br />development in several phases, and has contracted with URS to provide surveying, platting, building condominium <br />documents, water, sewer, storm water management design and pennitting with the South Florida Water Management District <br />(SFWMD), coordination of the SFWMD permitting with the Unit 2 permitting being perfonnedby NPBCID, site earthwork <br />analysis, grading, and utilities design and permitting with Seacoast Utilities, and construction phase services for the site <br />b. infrastructure systems, Project also included the design of two (2) exclusive right turn lanes (pennitted with FDOT) and two <br />(2) signalized intersections (pennitted with FDOT and PBC Traffic Division).The stormwater management system consisted <br />of catch basins, positive drainage piping system, and construction of an 8-acre on-site lake with an overflow control <br />structure, We have also participated in the Development Review Committee (DRC) process with the City of Palm Beach <br />Gardens staff, and are working with a multi consultant team to provide integrated design and planning services for changing <br />this raw undeveloped tract of property located at PGA Boulevard just west of Military Trail into a sensational mixed use <br />project with multi-family housing, commercial and retail uses, and a 3,000 seat cultural center for local perfonnances and the <br />home of the Palm Beach Community Church. <br /> <br />Mr. Travis' role was to develop and implement project quality processes for this project, and monitor the project to ensure <br />all processes are adhered to, and are effective, <br /> <br />C. 1) TITLE AND LOCATION (City and State) <br />Biscayne Bay Coastal Wetlands <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br /> <br />URS <br />