Laserfiche WebLink
<br />,- <br />I <br />I <br /> <br />HARVARD JOllY <br /> <br />ARCHITECTURE <br /> <br />Df:SIGNING POSSIBIL liE S <br />51 N, r 19:J8 <br /> <br />3) Project Team <br />Summary <br /> <br />.. .... <br /> <br /> <br />'j~ <br />lA( <br /> <br />----. <br /> <br /> <br />Su pporting Staff <br /> <br /> <br /> <br />~':.') : <br />~/ I <br /> <br />. '. <br /> <br /> <br />City of Sunny Isles BfJach . RFQ No 10-0~-02' May 26, 2010 <br /> <br />The in house team for the City of Sunny Isles Beach has been selected based on anticipated <br />scope of services. Both Yvette London and Debbie Wilkinson have the full capabilities <br />to deliver all the services listed in Item 2) of this document. In addition. specialties have been <br />noted as follows; <br /> <br />Assigned: Project Executive / Project Manager - POINT OF CONTACT <br />Contact. Yvette V. London, AlA, LEED AP - Senior Vice President <br />Email: ylon9'on@/]gryarQjgl!Lcom · 954-486-7910 office · 954-829-6374 cell <br /> <br />Additional Specialties / Capabilities: <br />Conditions Assessment; Code Compliance Assessment; Master Planning; Programming; <br />Space Planning; interior Design; Conceptual Design; LEED Innovations <br /> <br />Assigned. Project Manager! Senior Project Architect <br />Contact: Debbie D. Wilkinson, AlA, NCARS, LEED AP, CPTED <br />Email:c};wilkinson@harvardiollv.com · 954-486-7910 office · 561-252-9850 cell <br /> <br />Additional Specialties / Capabilities: <br />Quality Control; LEED Innovations; Conditions Assessment; Code Compliance Assessment; <br />Master Planning; Programming; Space Planning; interior Design; Conceptual Design; <br />Specialized Needs Assessment Reporting; CPTED applications <br /> <br />Assigned.' Projeet Coordinator <br />Contact: Paula Rouyet <br />Email.' m.rouyet@hi3.1";ti3rdig}lY.(LO_r7] · 954-486-7910 office <br /> <br />Project Assigned Capabilities: <br />Design; Graphic Conceptual Drawings; Color Selection and Coordination; General Design <br />Work, All Phases of Construction Documentations; Presentations; Conditions Assessment; <br />Interior Design; Interior Planning and Design; Master Planning <br /> <br />Assigned. Project Coordinator <br />Contact: Samantha Meira, Associate AlA, LEED AP, CPTED <br />Email: s.meira@harvgrdjQfJy.corJ] · 954-486-7910 office <br /> <br />Project Assigned Capabilities: <br />Design; Graphic Conceptual Drawings; Color Selection and Coordination; General Design <br />Work; All Phases of Construction Documentations; Presentations; Interior Design; Interior <br />Planning and Design; Master Planning, 30 Imaging; LEED Innovations; CPTED applications. <br /> <br />Assigned: Construction Administration <br />Contact.' John Rhodes <br />Email: f.J/]odeii@haQt'i3.!dJQfJy~(;Qfl1 · 954-486-7910 office · 954-829-2511 cell <br /> <br />Project Assigned Capabilities: <br />Reports, Analysis; Inspection; Public Involvement; Post Design Services; Conditions <br />Assessment and Reporting; Construction Administration; Field Observations; Warranty <br />Inspections, Building Start-Up; Post Occupancy Evaluation <br /> <br />Section 1 . Page 3 of 8 <br />