My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 4
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-11-01 Landscape Maintenance Services
>
Addendums
>
Addendum No. 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 12:46:15 PM
Creation date
12/21/2010 2:45:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Svcs.
Bid No. (xx-xx-xx)
10-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S -ANY 1S4F <br />s <br />A. <br />C� <br />U _ <br />* <br />/9 9 <br />yF �* FLOR <br />C /TY OF SUN PLO <br />Addendum No. 4 <br />CITY OF SUNNY ISLES BEACH <br />Professional Landscape Services <br />CITY RFP NO. 10 -11 -01 <br />To All Bidders: <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />Response to Questions: <br />1. Item D3, Organic Eucalyptus mulch has a quantity of 3" cubic yards. I <br />understand the mulch is to be installed at a 3" depth so are we just pricing 1 <br />cubic yard? <br />Clarification: Item D3 as depicted on the Bid Form (page 61 of 106) should <br />depict an ESTIMATED QUANTITY of 3 Cubic Yards. It currently reads 3" <br />which is to be deleted. <br />2. Items G17 and 14 reference Pier Park and say to see E8. I'm assuming those <br />items are to be left blank. <br />Clarification: Item G17 is for Pier Park as is 1 -4. Both refer to E -8. As stated <br />on the Bid Form, item E -8 includes both elements specified in G and I. <br />Contractor shall become familiar with the site. <br />3. Also, J9 does not specify a number of services nor a unit price. Are we to <br />leave that item blank as well? <br />Clarification: J9 should include an ESTIMATED QUANTITY of 52 week and a <br />UNIT PRICE on a per week basis. Contractor shall provide the information to <br />ensure completeness. <br />
The URL can be used to link to this page
Your browser does not support the video tag.