My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 02-04-01 Sidewalk Improv. on Atlantic Blvd.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:00:33 AM
Creation date
1/5/2011 3:21:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sidewalk Improv. Atlantic Blvd.
Bid No. (xx-xx-xx)
02-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br />SECTION 00010 <br />TABLE OF CONTENTS <br />Division 00000 <br />Table of Contents <br />Section <br />00010 <br />List Of Drawings <br />Section <br />01146 <br />Advertisement for Bids <br />Section <br />00015 <br />Instructions to Bidders <br />Section <br />00100 <br />Bid Form <br />Section <br />00210 <br />Award Preference For Tied Bids <br />Section <br />00410 <br />Bid Bond <br />Section <br />00420 <br />List Of Proposed Subcontractors <br />Section <br />00432 <br />BIDDER Qualification Statement <br />Section <br />00434 <br />Non - Collusion Affidavit <br />Section <br />00450 <br />Sworn Statement Florida Statutes On Public Entity Crimes <br />Section <br />00454 <br />Notice Of Award <br />Section <br />00456 <br />Agreement <br />Section <br />00510 <br />Notice To Proceed <br />Section <br />00526 <br />Form Of Payment Bond <br />Section <br />00550 <br />Form Of Performance Bond <br />Section <br />00612 <br />Acknowledgment Of Conformance With OSHA Standards <br />Section <br />00614 <br />General Conditions <br />Section <br />00620 <br />Supplementary Conditions <br />Section <br />00710 <br />Section <br />00810 <br />Division 01000 General Requirements <br />Summary Of Work <br />Special Coordination <br />Section <br />01110 <br />Processing of Application For Payment <br />Section <br />01146 <br />Shop Drawings <br />Section <br />01290 <br />Standard Specifications and Details <br />Section <br />01336 <br />Regulatory Requirements <br />Section <br />01412 <br />Abbreviations <br />Section <br />01414 <br />References and Standards <br />Section <br />01422 <br />Quality Control - Unfavorable Conditions <br />Section <br />01.424 <br />Temporary Facilities <br />Section <br />01450 <br />Facility Testing <br />Section <br />01500 <br />Close Out Documents <br />Section <br />01660 <br />Section <br />01700 <br />Division 02000 Site Work Technical Specifications <br />Not Included <br />Division 03000 Concrete Technical Specifications <br />Not Included <br />Division 04000 Masonry Technical Specifications <br />Not Included <br />Division 05000 Metals Technical Specifications <br />Not Included <br />Division 06000 Woods and Plastics Technical Specification <br />Not Included <br />lil 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.