Laserfiche WebLink
SECTION 01450 <br />QUALITY CONTROL <br />UNFAVORABLE CONSTRUCTION CONDITIONS <br />During unfavorable weather, wet ground, or other unsuitable construction conditions, the CONTRACTOR shall <br />confine his operations to Work which will not be affected adversely thereby. No portion of the Work shall be <br />constructed under conditions which would affect adversely the quality or efficiency thereof, unless special means or <br />precautions are taken by the CONTRACTOR to perform the Work in a proper and satisfactory manner. <br />01450-1 <br />