My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />1.04 SUBMITTALS <br />A. Contractor to submit a list of equipment, procedure, and labor force <br />anticipated for use of shrub and tree relocation. <br />B. Contractor to submit a schedule by day as to how many units can be <br />dug require pruning, thedrelocation those <br />begin materials <br />may req p <br />of the specified root pruning period. <br />C. Contractor shall apply and secure any and all permits if required by any <br />city, state, or federal agency or governing body. <br />1.05 GUARANTEE <br />A. Guarantee all plant material for a period of twelve months after date of <br />Substantial Completion. <br />B Replacment rejection under this teed shall be <br />montlhsef within two of <br />installation. <br />C. Repair damage to other plants, lawn or construction work during plant <br />replacement at no cost to the Owner (this includes, but is not limited <br />to, damage to curbs, walks, roads, fences, site furnishings, etc.). <br />1.06 TAGGING <br />A. Trees and shrubs within the designated areas for relocation shall be <br />clearly marked by means of yellow plastic surveyor's ribbons and <br />coordinated with Landscape Architect and shall be inspected and <br />approved by the Owner's representative prior to root pruning and /or <br />digging. <br />1.07 ROOT PRUNING <br />A. Trees to be relocated shall be root pruned at least 45 days prior to <br />digging with clean, sharp equipment. No mechanical means (ie. <br />Backhoes) may be utilized for the root pruning only shovels or <br />' jackhammer type shovels shall be permitted. A pneumatic excavating <br />tool may be utilized to expose the roots at locations within 5' from <br />existing trees to better route lines or pipes to preserve the root mass <br />of those trees noted to remain. The specific requirements for root ball <br />sizes shall be in accordance with the table below or to the drip line of <br />the tree. The root - pruned trees shall be watered 3 times a week by <br />Landscape Contractor as part of this contract. <br />B. Palms and shrubs to be relocated shall be root pruned at least 30 days <br />prior to digging, with clean, sharp equipment. Palms relocated by tree <br />spade may forego the root - pruning requirement, but shall adhere to <br />root ball size charts below. <br />1 <br />1 09/03 02481 -2 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.