My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' <br />B. <br />The Contractor shall engage the services of an approved testing <br />or below proportional minimum 7 day strengths where proper relation <br />between 7 and 28 day strengths have been established by tests, <br />proportions, water content, or temperature conditions shall be <br />the specifications. <br />changed to secure the required strength. <br />C. <br />B. The Contractor shall cooperate in the making of such tests to the extent <br />of allowing free access to the work for the selection of samples, <br />field control cylinder specimens and to conduct other tests as <br />providing heated (when required) moist storage facilities for specimens, <br />affording protection to the specimens against injury or loss through his <br />operations, and furnishing material and labor required for the purpose of <br />quality. <br />taking concrete cylinder samples, curing boxes and shipping boxes. All <br />D. <br />shipping of specimens will be paid for by the Contractor. <br />C. Slump tests will be made in the field by the testing laboratory. <br />3.04 INSPECTION AND CONTROL <br />A. The preparation of forms, placing of reinforcing steel, conduits, pipes, <br />and sleeves, batching, mixing, transportation, placing and curing of <br />' concrete shall be at all times under the inspection of the Engineer. <br />1 09/03 03300 -9 03- 3148.A -R <br />B. <br />The Contractor shall engage the services of an approved testing <br />ilaboratory <br />to establish the basic mixtures of concrete as required by <br />the specifications. <br />C. <br />The Contractor will engage the services of a testing laboratory to test <br />field control cylinder specimens and to conduct other tests as <br />specified herein or as deemed required by the Engineer to insure the <br />quality. <br />' <br />D. <br />Air entrainment shall be measured by the testing laboratory or his <br />ASTM <br />representative at time of concrete deposit in accordance with <br />Designation C231. <br />3.05 CONCRETE APPEARANCE <br />A. <br />Concrete for every part of the work shall be homogeneous structure <br />which, when hardened, will have the required strength, durability and <br />appearance. <br />B. <br />Formwork, mixtures and concrete placement workmanship shall be <br />such that concrete surfaces, when exposed, will require only minimal <br />finishing with no excess honeycombing, voids or irregular color lines. <br />1 09/03 03300 -9 03- 3148.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.