My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� <br />it <br />�I <br />3.02 SHIPPING, HANDLING AND STORAGE <br />A. Special care in handling shall be exercised during delivery, distribution <br />and storage of pipe to avoid damage and setting up stresses. Damaged <br />pipe will be rejected and shall be replaced at the Contractors expense. <br />Pipe and specials stored prior to use shall be stored in such a manner as <br />to keep the interior free from dirt and foreign matter. <br />PART 4 - PERSONNEL REQUIREMENTS <br />4.01 GENERAL <br />A. A responsible representative of the permittee must be present at all times <br />during the crossings of Collins Avenue (A -1 -A). A responsible <br />representative as specified herein is defined as a person experienced in <br />the type of work being performed and who has the authority to represent <br />the permittee in a routine decision making capacity concerning the <br />manner and method of carrying out the work. <br />B. The CONTRACTOR shall have a sufficient number of competent workers <br />on the job at all times to ensure the crossing is made in a timely and <br />otherwise satisfactory manner. Adequate personnel for carrying out all <br />phases of the actual crossing operation (where applicable: boring <br />machine operator, qualified welder(s) for joining additional casing <br />sections, crane or lift operator for removing spoil material and laborers as <br />necessary for various related tasks) must be on the job site at the <br />beginning work. A competent and experienced supervisory representing <br />the contractor that is thoroughly familiar with the equipment and type of <br />work to be performed, must be in direct charge and control of the <br />operation at all times. In all cases the supervisor must be continually <br />present at the job site during the actual crossing operation. <br />PART 5 - INSTALLATION <br />5.01 GENERAL <br />r 09/03 <br />A. Erection or Installation of Appropriate Safety and Warning Devices - <br />Erection or installation of appropriate safety and warning devices shall be <br />completed prior to beginning work. <br />16200 -7 03- 1438.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.