My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />1 3.02 INSTALLATION <br />A. Transplant sod within 48 hours after harvesting. <br />B. Begin sodding at bottom of slopes. <br />C. Lay first row of sod in straight line with long dimension of pads parallel <br />to slope contours. <br />D. Butt side and end joints. Ensure that joints are tight, thereby <br />eliminating the need to patch and /or topdress to eliminate gaps. <br />E. Stagger end joints in adjacent rows. <br />F. Do not stretch or overlap rows. <br />G. Peg sod on slope ratio of 1 in 3 or greater with minimum of two <br />stakes per square yard. <br />H. Sprinkle sod immediately after transplanting. <br />I. Roll sod, except on pegged areas, with roller weighing no more than <br />150 lbs. per foot of roller width. <br />J. Water sod and soil to depth of 6 inches within four hours after rolling. <br />K. Top dressing for sodded areas shall be clean sand, mined from fresh <br />water sources. Sand mined from salt water is unacceptable. <br />3.03 LAWN ESTABLISHMENT <br />A. Watering: <br />1. Keep sod moist during first week after planting. <br />2. After first week, supplement rainfall to produce a total of 2 <br />inches per day. <br />3. It is the contractors responsibility to water all plant material. <br />B. Mowing: <br />1 . Maintain St. Augustine grass between 2 inches and 2-1/2 <br />inches in height. When grass reaches 3 inches in height, mow <br />to 2 inches in height. <br />2. Do not cut off more than 40% of grass leaf in single mowing. <br />3. Remove all grass clippings throughout. <br />C. Resod spots larger than 1 square foot not having uniform stand of <br />grass. <br />D. Weed Eradication: Between second and third mowing, apply herbicide <br />specifically recommended for grass type uniformly at manufacturer's <br />recommended rate. <br />E. Fertilizer: Apply fertilizer uniformly at manufacturer's recommended <br />rate two days after sodding and at three -month intervals thereafter. <br />Water in to avoid "burning" or damaging grass. <br />1 07/03 02487 -4 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.