My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />3.3 Bidders shall examine existing site improvements, and conditions, utilities, <br />and streets to determine all conditions which will affect the Work. <br />' 4. INTERPRETATION OF BIDDING DOCUMENTS <br />' 4.1 All questions requiring clarification or interpretation of the Bidding <br />Documents shall be made in writing and shall reach the office of the Owner <br />at least 5 days prior to the date for receipt of bids. Direct all requests to the <br />' attention of the Project Engineer at Calvin, Giordano & Associates, Inc. (954) <br />921-7781. <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />' b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, or <br />other questionnaires. <br />' 07/03 00100 -2 03- 4138.A <br />4.2 <br />Any modification or interpretation of the Bidding Documents will be made by <br />' <br />Addendum to all who are recorded by the Engineer as having received a <br />complete set of Bidding Documents. <br />' <br />4.3 <br />Interpretations or modifications of Bidding Documents made in any manner <br />other than by Addendum will not be binding. <br />4.4 <br />A Bidder, prior to submitting his Bid, shall ascertain that he has received all <br />Addenda issued, and shall acknowledge their receipt in the Bid Form. <br />i5. <br />SUBSTITUTIONS <br />5.1 <br />Bidders represent that their Bid is based upon the materials and equipment <br />' <br />described in the Bidding Documents. <br />5.2 <br />Requests for substitutions will be considered prior to receipt of bids if they <br />' <br />reach the Engineer at least 5 days prior to the date for receipt of bids. <br />5.3 <br />Acceptance by the Engineer of a proposed substitution will be issued in the <br />form of an Addendum or Substitution Request Form. <br />6. QUALIFICATION <br />OF BIDDERS <br />6.1 <br />If requested, the Bidder shall submit to the Engineer, prior to award of <br />contract, a properly completed Contractors Qualification Statement, along <br />with any other evidence of his satisfactory experience and ability to perform <br />the proposed Work. <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />' b. Determination of lack of competency as may be revealed by <br />qualification statements, financial statements, experience records, or <br />other questionnaires. <br />' 07/03 00100 -2 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.