My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1 <br />C. Broadcast under foliage canopy and incorporate into soil. <br />D. Water immediately until root structure of plant is wet. Assure <br />protection from fertilizer burn. <br />E. Apply foliar nutrient spray at time of planting (summer excluded) and <br />repeat three months from first application. Schedule fertilization with <br />Landscape Architect. Drench palm leaves with foliar nutrient spray at <br />the manufacturer's recommended rate to all Phoenix Palm species. <br />3.06 WEED CONTROL <br />A. Apply post- emergent herbicide, "Round -up" as manufactured by <br />Monsanto Corp. or approved equal, per manufacturer's rate and <br />method of application to all landscape bed areas as necessary. <br />B. Apply pre- emergent herbicide "Ron- Star" before mulching and again as <br />necessary throughout required maintenance period to prevent weed <br />seed germination. <br />C. The Landscape Contractor shall verify that the herbicide and <br />application technique will not damage plant material prior to <br />application, and shall replace, and /or repair damage to any plant injured <br />by herbicide application at no cost to the Owner. <br />3.07 TOP MULCHING <br />A. Top mulch planting pits, trenches, and areas within two days after <br />planting. <br />B. Cover watering basin or bed evenly with 3 inch compacted depth of <br />top mulch material. <br />C. Water thoroughly, immediately after mulching. <br />D. "Cut in" mulch at plant bed /sod line. <br />E. Hose down planting area with fine spray to wash leaves of plants at <br />least twice a week, or as required. <br />F. Exclude mulch from annual and Bromeliad beds. <br />3.08 GUYING AND STAKING OF TREES <br />A. Stake trees as shown on the drawings except where they are planted <br />in special locations where guying is not feasible. <br />1 . Stake Installation: <br />a. Drive stakes perpendicularly, 3 feet into ground at edge <br />of root ball. Do not drive stake through soil separator or <br />drainage gravel if present. Do not drive stakes through <br />root ball. <br />b. Number of stakes as shown. <br />07/03 02490 -10 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.