My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rnot be employed. Chutes shall be metal or metal -lined and each <br />section shall have approximately the same slope. The slope shall not <br />be less than 25 nor more than 45 degrees from the horizontal and <br />shall be such as to prevent the segregation of the ingredients. The <br />discharge end of the chute shall be provided with a baffle plate or <br />spout to prevent segregation. If the discharge end of the chute is <br />more than 5 feet above the surface of the concrete in the forms, a <br />spout shall be used, and the lower end maintained as near the surface <br />of deposit as practicable. When the operation is intermittent, the <br />chute shall discharge into a hopper. Chutes shall be thoroughly <br />cleaned before and after each run, and the debris and any water shall <br />be discharged outside the forms. Concrete shall not be allowed to <br />flow horizontally over distances exceeding 5 feet. <br />H. In thin sections of considerable height, concrete shall be placed using <br />suitable hoppers, spouts with restricted outlets, or otherwise, as <br />required or approved. <br />Concrete during and immediately after depositing shall be thoroughly <br />compacted by means of suitable tools. Internal type mechanical <br />vibrators shall be employed to produce required quality of finish. <br />Vibration shall be done by experienced operators under close <br />supervision and shall be carried on long enough to produce <br />homogeneity and optimum consolidation without permitting <br />segregation of the solid constituents of "pumping" or migration of air. <br />All vibrators shall be supplemented by proper wooden spade puddling <br />adjacent to forms to removed included bubbles and honeycomb. This <br />is essential for the top lifts of walls. All vibrators shall travel at least <br />10,000 rpm and be of adequate capacity. At least one vibrator shall <br />be used for every 10 cubic yards of concrete placed. In addition, one <br />spare vibrator in operating condition shall be on the site. <br />J. Concrete slabs on the ground shall be well- tamped into place and <br />foundation material shall be well- tamped, and rolled until thoroughly <br />compacted prior to placing concrete. <br />K. Concrete shall be deposited continuously in layers of such thickness <br />that no concrete will be deposited on concrete which has hardened <br />sufficiently to cause the formation of seams and planes of weakness <br />within the section. If a section cannot be placed continuously, <br />construction joints may be located at points as provided for in the <br />Drawings or approved by the Engineer. <br />3.08 CURING AND PROTECTION <br />A. Protect all concrete work against injury from the elements and <br />defacements of any nature during construction operations. Special <br />07/03 03300 -12 03- 3148.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.