My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1 <br />G. It is the intent of these Specifications that the electrical system shall be <br />suitable in every way for the service required. All material and all work which <br />may be reasonably implied as being incidental to the work of this Section shall <br />be furnished at no extra cost. <br />H. Furnish and install a complete underground system as herein specified and <br />shown on the drawings. <br />1.02 SERVICE AND METERING <br />A. Permanent electrical power will be provided by Florida Power & Light Company <br />at voltages indicated on the drawings. The CONTRACTOR shall furnish and <br />install two new metered services as per Florida Power & Light Company <br />direction. <br />B. The CONTRACTOR shall furnish and install the service riser, secondary conduit <br />and wire from the service point to the service entrance equipment. The <br />CONTRACTOR is responsible for confirming this distance with the power <br />company prior to bid time. The power company contact is Mr. Ellis Clenton, <br />phone (305) 770 -7934. <br />1.03 CODES, INSPECTION AND FEES <br />A. All material and installation shall be in accordance with the latest edition of the <br />National Electrical Code and all applicable national, local and state codes, laws <br />and ordinances. <br />B. Pay all fees required for permits and inspections including any charges <br />associated with the service modifications. <br />1.04 TESTS <br />t <br />� o,o3 <br />A. Test all systems and repair or replace all defective work. Make all necessary <br />adjustments to the systems and instruct CITY's personnel in the proper <br />operation of the systems. <br />B. The following minimum tests and checks shall be made prior to the energizing <br />of electrical equipment. Test shall be by the CONTRACTOR and a certified <br />test report shall be submitted providing all test results and stating that the <br />equipment meets and operates in accordance with the Manufacturer's and job <br />specifications, and that equipment and installation conforms to all applicable <br />Standards and Specifications: <br />1 . Testing of protective relays for calibration and proper operation. <br />16050 -2 <br />03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.