My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Cutting heads shall be undamaged and have no missing or <br />broken teeth or bits. <br />b) Pinned or hinged wing cutters must be constructed in such <br />a manner as to ensure overboring does not exceed limits <br />specified in Section 5.E (3) of this exhibit. <br />4. Auger Tracks - Supports boring machine and provides line and <br />grade control. <br />a) Tracks shall be straight and otherwise undamaged with no <br />broken welds. <br />b) Tracks shall be constructed so as to remain rigid at joints <br />and allow no appreciable flexing as power unit passes. <br />5. Jacks - Hydraulic, mechanical or manual power units providing <br />horizontal thrust for pushing casing or carrier pipe. Shall have <br />sufficient power to satisfactorily complete the proposed crossing <br />according to the manufacturers recommendations. <br />a) Hydraulic - Shall be in sound operating condition. Hoses <br />shall not be cracked or split; all couplings and fittings shall <br />tbe tight and entire system reasonably free from leaks. <br />Hydraulic cylinder rods should be clean and smooth to <br />prevent damage to cylinder seals. <br />b) Mechanical - Includes manual and power drivers, ratchet <br />type jacks, winch and pulley systems. All mechanical <br />jacking systems shall be in sound operating condition with <br />no broken welds, excessively worn parts, broken teeth, <br />badly bent or otherwise misaligned components. All ropes, <br />cables, clamps and other non - mechanical but essential items <br />shall be in sound condition. <br />c) Other- Devices of systems for providing horizontal thrust <br />other than those previously defined in the preceding <br />sections shall not be used unless approved for use by the <br />Department prior to commencement of work. Consideration <br />for approval will be made on an individual basis for each <br />properly permitted crossing. The proposed device or <br />system will be evaluated prior to approval or rejection on its <br />potential ability to complete the crossing satisfactorily <br />07/03 16200 -5 03- 1438.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.