My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 the requirements of the Department of Environmental <br />Regulation. <br />Flaring of the casing end will be allowed provided that the <br />original casing diameter is exceeded by no more than 3/4 <br />inch. <br />Any cuts, tears or cracks made to facilitate flaring shall be <br />repaired and reinforced by welding to ensure that the <br />strength of the flared section is equal to or greater than the <br />original section. The use of a misaligned, undersized auger <br />to cut an oversized hole is prohibited. <br />4) Relationship between auger or cutting head to leading end of first <br />casing section. The leading end of the first casing section shall be <br />straight cut ninety degrees to the centerline of the casing and the <br />distance between the back of the cutting head or leading edge of <br />the first bare auger section, to the leading end of the casing shall <br />be as follows under the appropriate soil condition. <br />a) Rock - On crossings made through solid rock, where the <br />cutting head must precede the casing, the space between <br />the back of the cutting head and the end of the casing shall <br />be limited to the clearance necessary to allow the cutting <br />' head to function without coming in contact with the end of <br />the casing. In areas where sand pockets may be <br />encountered the cutting head must be construction so that <br />' it can be retracted into the casing, to within the limits <br />specified in this section for the particular material <br />encountered. <br />' b) Hard pan, clay, hard sand -clay and stable cohesive soils - <br />As in rock, the cutting head should normally precede the <br />casing but the type cutting head used must allow no more <br />than two (2) inches between the back of the head and the <br />1 leading end of the casing. Cutting heads with cylindrical, <br />pointed chippers designed for use in solid rock shall not be <br />used. <br />c) Loose unstable soil - The distance between the leading end <br />of the first auger section and the leading end of the casing <br />shall be as necessary to maintain a solid plug of spoil <br />' 07/03 16200 -12 03- 1438.A <br />I <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.