My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 8 - REPORTING PROCEDURES <br />8.01 GENERAL <br />A. An accurate log shall be kept by the CONTRACTOR or authorized <br />representative on the crossing. The purpose of this log is to record and <br />report the data necessary to isolate and identify all common factors <br />associated with underground crossing failures. <br />B. The log shall be forwarded to the Engineer with the permit, subsurface <br />investigation report, dewatering plan (if applicable), completion notice, <br />and related correspondence. <br />C. The data shall be recorded on the job site during the actual crossing <br />operation. <br />END OF SECTION <br />07/03 16200 -19 03- 1438.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.