My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />i] <br />i� <br />F1 <br />Nominal Maximum Size <br />of Coarse Aggregate(in) <br />211 <br />1„ <br />3/4" <br />1.07 ACCEPTANCE TESTS <br />I 07/03 <br />Total Air Measured at <br />Discharqe from truck ( %) <br />2.5 - 5.5 <br />6.5 <br />4.0-8.0 <br />A. Conformity of aggregates to these Specification, and the actual <br />proportions of cement, aggregates, and water necessary to produce <br />concrete conforming to the requirements set forth in Table A, shall be <br />03300 -4 03- 3148.A <br />TABLE B <br />Slump (inches) <br />Portion of Structure Max.* Min. <br />' <br />Pavement and slabs on ground 3 2 <br />Plain footings, gravity walls, <br />slabs and beams 3 2 <br />Heavy reinforced foundation <br />' <br />walls and footings 4 2 <br />Thin reinforced walls and columns 4 2 <br />* May be increased 1 -inch if proper method of consolidation is <br />used. <br />H. Concrete shall be of such consistency and mix composition that it can <br />be readily worked into the corners and angles of the forms and around <br />the reinforcement, inserts, and wall castings without permitting <br />' <br />materials to segregate or free water to collect on the surface, due <br />consideration being given to the methods of placing and compacting. <br />I. No excessively wet concrete will be permitted, and if at any time <br />concrete of such consistency beyond the limits of Table B is delivered <br />to the job, the Engineer may direct the Contractor to reject same or to <br />add extra cement for which no additional payment will be made. A <br />supply of the approved cement shall be kept available at the site for <br />this purpose. No additional water shall be added by drivers of <br />transit -mix trucks except that established for the design. Failure to <br />comply with this requirement shall be justification for rejecting the <br />' <br />concrete. <br />J. The entrained air, as measured by the Pressure Method, ASTM C231, <br />shall be as shown in Table C. <br />TABLE C <br />i] <br />i� <br />F1 <br />Nominal Maximum Size <br />of Coarse Aggregate(in) <br />211 <br />1„ <br />3/4" <br />1.07 ACCEPTANCE TESTS <br />I 07/03 <br />Total Air Measured at <br />Discharqe from truck ( %) <br />2.5 - 5.5 <br />6.5 <br />4.0-8.0 <br />A. Conformity of aggregates to these Specification, and the actual <br />proportions of cement, aggregates, and water necessary to produce <br />concrete conforming to the requirements set forth in Table A, shall be <br />03300 -4 03- 3148.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.